Evesham EVE
| STP | Time | From | To | Platform | Expected | Status | Formation |
|---|---|---|---|---|---|---|---|
| WTTThe permanent working timetable | 0544 | Oxford Down Engineers Sidi | Ledbury Sidings | ||||
| WTTThe permanent working timetable | 0635 | Great Malvern | London Paddington | 5 carriages 800020 | |||
| WTTThe permanent working timetable | 0644 | Swindon Transfer | Cheltenham Lansdown Loop | cancelled |
Italic estimated timing, bold is actual.
Updated 05:24