Hensall HEL
3 trains today · Northern
| STP | Time | From | To | Platform | Expected | Status | Formation |
|---|---|---|---|---|---|---|---|
| VSTPVery short term plan, created on or near the day | 0146 | Drax Aes (Gbrf) | Drax Aes (Gbrf) | ||||
| VAROverlay: a short-term plan replacing the timetable for this date | 0146½ | Liverpool Biomass Tml Gbf | Drax Aes (Gbrf) | cancelled | |||
| WTTThe permanent working timetable | 0147 | Drax Power Station | Immingham Biomass Lp (Dbc) | ||||
| VAROverlay: a short-term plan replacing the timetable for this date | 0201 | Drax Aes (Gbrf) | Liverpool Biomass Tml Gbf | ||||
| WTTThe permanent working timetable | 0218½ | Drax Aes (Flhh) | Hope (Earles Sidings) Fhh | ||||
| WTTThe permanent working timetable | 0229½ | Immingham Biomass Lp (Dbc) | Drax Power Station | ||||
| WTTThe permanent working timetable | 0237 | Drax Power Station | Immingham Biomass Lp (Dbc) | ||||
| WTTThe permanent working timetable | 0252 | Immingham Biomass Lp (Dbc) | Drax Power Station | ||||
| WTTThe permanent working timetable | 0320½ | Immingham Biomass Lp (Dbc) | Drax Power Station |
Italic estimated timing, bold is actual.
Updated 01:27