Hungerford HGD
| STP | Time | From | To | Platform | Actual / Expected | Status | Formation |
|---|---|---|---|---|---|---|---|
| VAROverlay: a short-term plan replacing the timetable for this date | 0624 | Reading | Bedwyn | 2 | 0630 | arrived+7 | 2 carriages 165129 |
| VAROverlay: a short-term plan replacing the timetable for this date | 0644 | Bedwyn | Newbury | 0649 | 2 carriages 165129 | ||
| VAROverlay: a short-term plan replacing the timetable for this date | 0714 | Newbury | Bedwyn | 2 carriages 165129 | |||
| WTTThe permanent working timetable | 0745 | Bedwyn | Newbury | 2 carriages 165129 | |||
| WTTThe permanent working timetable | 0756½ | Tytherington | Quainton Railhead | ||||
| WTTThe permanent working timetable | 0812 | Merehead Quarry | Quainton Railhead | ||||
| WTTThe permanent working timetable | 0812 | Merehead Quarry | Hanwell Bridge Loop | ||||
| WTTThe permanent working timetable | 0816 | Newbury | Bedwyn | 2 carriages 165129 | |||
| VAROverlay: a short-term plan replacing the timetable for this date | 0839 | Plymouth | London Paddington | 9 carriages 800318 |
Italic estimated timing, bold is actual.
Updated 06:45