Metheringham MGM
30 trains today · East Midlands Railway · 86% on time so far
EMR
| STP | Time | From | To | Platform | Expected | Status | Formation |
|---|---|---|---|---|---|---|---|
| WTTThe permanent working timetable | 2248 | Rylstone Tilcon (Gbrf) | Peterborough West Yard | ||||
| VAROverlay: a short-term plan replacing the timetable for this date | 2259½ | Barnby Dun Roc. Glass GBRF | March Up Yard GBRF | ||||
| VAROverlay: a short-term plan replacing the timetable for this date | 2259½ | Monk Bretton Redfearns Gbr | March Up Yard GBRF | 2251½ | 2251½ | ||
| WTTThe permanent working timetable | 2306½ | Peterborough North Yd GBRF | Barnetby Down Recp GBRF | ||||
| WTTThe permanent working timetable | 2324½ | Doncaster Down Decoy GBRF | P'boro Westwood Sdgs GBRF | ||||
| VAROverlay: a short-term plan replacing the timetable for this date | 2340 | Hartlepool Pd Ports Fl | Willesden Euroterminal | 2320 | 2320 | ||
| WTTThe permanent working timetable | 0002 | Peterborough | Lincoln | 2 carriages 170530 |
Italic estimated timing, bold is actual.
Updated 22:28