This is Norton Junction on 29th August 2026. See Norton Junction live now →
Norton Junction
| STP | Time | From | To | Platform | Actual | Status | Formation |
|---|---|---|---|---|---|---|---|
| VAROverlay: a short-term plan replacing the timetable for this date | 0439½ | Wentloog (Freightliners) | Daventry DRS (Tesco) | 0452 | passed+13 | ||
| WTTThe permanent working timetable | 0505 | Margam T.C. | Round Oak | ||||
| WTTThe permanent working timetable | 0545 | Birmingham New Street | Cardiff Central | 0543 | passed-2 | 3 carriages 170101 | |
| WTTThe permanent working timetable | 0550½ | Gloucester | Great Malvern | 0551 | passed | 2 carriages 158749 | |
| WTTThe permanent working timetable | 0558 | Oxford Down Engineers Sidi | Ledbury Sidings | ||||
| WTTThe permanent working timetable | 0558 | Oxford Down Engineers Sidi | Ledbury Sidings | ||||
| WTTThe permanent working timetable | 0616½ | Great Malvern | London Paddington | 0616 | passed | 9 carriages 800310 | |
| WTTThe permanent working timetable | 0623 | Birmingham New Street | Cardiff Central | 0626 | passed+3 | 4 carriages 170112+170116 | |
| WTTThe permanent working timetable | 0643 | Bristol Parkway | Great Malvern | 0634 | passed-9 | 9 carriages 800319 | |
| WTTThe permanent working timetable | 0656½ | Great Malvern | Bristol Temple Meads | 0656 | passed | 2 carriages 158749 | |
| WTTThe permanent working timetable | 0700½ | Swindon Transfer | Cheltenham Lansdown Loop | cancelled |
Italic estimated timing, bold is actual.
Updated 10:57