This is Chacewater Signal R14 on 21st September 2026. See Chacewater Signal R14 live now →
Chacewater Signal R14
| STP | Time | From | To | Platform | Actual | Status | Formation |
|---|---|---|---|---|---|---|---|
| WTTThe permanent working timetable | 0529½ | Penzance | London Paddington | U | 0529 | passed | 5 carriages 802002 |
| WTTThe permanent working timetable | 0550 | Penzance | Newquay | U | 0550 | passed | 4 carriages 150246+150261 |
| WTTThe permanent working timetable | 0612½ | Penzance | Exeter St Davids | U | 0612 | passed | 5 carriages 800018 |
Italic estimated timing, bold is actual.
Updated 17:49