This is Southall on 23rd September 2026. See Southall live now →
Southall STL
| STP | Time | From | To | Platform | Actual | Status | Formation |
|---|---|---|---|---|---|---|---|
| WTTThe permanent working timetable | 1741½ | London Paddington | Hereford | 1 | cancelled | ||
| WTTThe permanent working timetable | 1855½ | London Paddington | Swansea | 1 | cancelled | ||
| WTTThe permanent working timetable | 1859 | Bristol Temple Meads | London Paddington | 2 | 1914 | passed+16 | 9 carriages 800303 |
| WTTThe permanent working timetable | 1905 | London Paddington | Great Malvern | 1 | cancelled | ||
| WTTThe permanent working timetable | 1908 | Reading | Abbey Wood (Elizabeth line) | 4 | 1910 | departed | 9 carriages 345057 |
| WTTThe permanent working timetable | 1910 | Newbury | London Paddington | 2 | 1911 | passed | 8 carriages 387146+387151 |
| WTTThe permanent working timetable | 1911 | Abbey Wood (Elizabeth line) | Heathrow Terminal 4 | 3 | 1911 | departed | 9 carriages 345061 |
| WTTThe permanent working timetable | 1911½ | London Paddington | Plymouth | 1 | 1911 | passed | 9 carriages 800305 |
| WTTThe permanent working timetable | 1913½ | London Paddington | Bedwyn | 1 | 1913 | passed | 5 carriages 802014 |
| WTTThe permanent working timetable | 1915 | Heathrow Terminal 4 | Abbey Wood (Elizabeth line) | 4 | 1915 | departed | 9 carriages 345031 |
| WTTThe permanent working timetable | 1916 | Abbey Wood (Elizabeth line) | Maidenhead | 3 | 1916 | departed | 9 carriages 345026 |
| VAROverlay: a short-term plan replacing the timetable for this date | 1916½ | Penzance | London Paddington | 2 | 1924 | passed+8 | 10 carriages 802018+802022 |
| WTTThe permanent working timetable | 1917½ | Southampton M.C.T. | London Gateway Frghtliner | 4 | |||
| WTTThe permanent working timetable | 1917½ | Bristol Freightliner Trml | London Gateway Frghtliner | 4 | |||
| WTTThe permanent working timetable | 1918 | London Paddington | Heathrow Terminal 5 | 1 | 1918 | passed | 8 carriages 387135+387141 |
| WTTThe permanent working timetable | 1919 | Shenfield | Heathrow Terminal 5 | 3 | 1918 | passed | 9 carriages 345038 |
| VSTPVery short term plan, created on or near the day | 1920½ | Reading | London Paddington | 2 | 1926 | passed+6 | 9 carriages 800302 |
| WTTThe permanent working timetable | 1920½ | Great Malvern | London Paddington | 2 | cancelled | ||
| WTTThe permanent working timetable | 1921 | London Paddington | Bristol Parkway | 1 | cancelled | 8 carriages 387159+387165 | |
| WTTThe permanent working timetable | 1922½ | Hayes & H'ton Tarmac Sdgs | Stoke Gifford (Fhh) | 3 | |||
| WTTThe permanent working timetable | 1923 | Heathrow Terminal 5 | London Paddington | 2 | 1922 | passed | 8 carriages 387131+387139 |
| WTTThe permanent working timetable | 1925 | Reading | Abbey Wood (Elizabeth line) | 4 | 1924 | departed | 9 carriages 345003 |
| WTTThe permanent working timetable | 1926 | Abbey Wood (Elizabeth line) | Heathrow Terminal 4 | 3 | 1926 | departed | 9 carriages 345001 |
| WTTThe permanent working timetable | 1927½ | Maidenhead Turnback Line | Old Oak Depot | 4 | 1928 | passed | 9 carriages 345042 |
| VSTPVery short term plan, created on or near the day | 1928½ | London Paddington | Reading | 1 | 1933 | passed+6 | 8 carriages 387142+387170 |
| WTTThe permanent working timetable | 1930 | Abbey Wood (Elizabeth line) | Reading | 3 | 1930 | departed | 9 carriages 345020 |
| WTTThe permanent working timetable | 1930 | Heathrow Terminal 4 | Abbey Wood (Elizabeth line) | 4 | 1931 | departed | 9 carriages 345029 |
| WTTThe permanent working timetable | 1933 | London Paddington | Heathrow Terminal 5 | 1 | 1935 | passed+3 | 8 carriages 387134+387138 |
| WTTThe permanent working timetable | 1934 | Heathrow Terminal 5 | Shenfield | 4 | 1934 | passed | 9 carriages 345004 |
| WTTThe permanent working timetable | 1935½ | Wembley Receptions 1-7 | Merehead Quarry (Fhh) | 3 | |||
| WTTThe permanent working timetable | 1935½ | Wembley Receptions 1-7 | Whatley Quarry F Liner Hh | 3 | 1933 | passed | |
| WTTThe permanent working timetable | 1937½ | London Paddington | Weston-super-Mare | 1 | 1946 | passed+10 | 9 carriages 800303 |
| WTTThe permanent working timetable | 1938 | Heathrow Terminal 5 | London Paddington | 2 | 1938 | passed | 8 carriages 387130+387137 |
| WTTThe permanent working timetable | 1940 | Reading | Abbey Wood (Elizabeth line) | 4 | 1939 | departed | 9 carriages 345007 |
| VSTPVery short term plan, created on or near the day | 1940 | Reading | London Paddington | 2 | 1940 | passed | 8 carriages 387143+387158 |
| WTTThe permanent working timetable | 1941 | Abbey Wood (Elizabeth line) | Heathrow Terminal 4 | 3 | 1941 | departed | 9 carriages 345045 |
| WTTThe permanent working timetable | 1942 | Worcester Foregate Street | London Paddington | 2 | cancelled | ||
| WTTThe permanent working timetable | 1945 | Heathrow Terminal 4 | Abbey Wood (Elizabeth line) | 4 | 1945 | departed | 9 carriages 345027 |
| WTTThe permanent working timetable | 1945 | Abbey Wood (Elizabeth line) | Maidenhead | 3 | 1945 | departed | 9 carriages 345049 |
| VSTPVery short term plan, created on or near the day | 1946 | London Paddington | Reading | 1 | 1945 | passed | 8 carriages 387146+387151 |
| VSTPVery short term plan, created on or near the day | 1946½ | Reading | London Paddington | 2 | 1947 | passed | 9 carriages 345008 |
| WTTThe permanent working timetable | 1947½ | Colnbrook Lafarge GBRF | Avonmouth West Wharf GBRF | 4 | |||
| WTTThe permanent working timetable | 1948 | London Paddington | Heathrow Terminal 5 | 1 | 1949 | passed | 8 carriages 387131+387139 |
| WTTThe permanent working timetable | 1949 | Shenfield | Heathrow Terminal 5 | 3 | 1949 | passed | 9 carriages 345035 |
| WTTThe permanent working timetable | 1954 | Maidenhead | Abbey Wood (Elizabeth line) | 4 | 1953 | departed | 9 carriages 345059 |
| WTTThe permanent working timetable | 1954½ | Heathrow Terminal 5 | London Paddington | 2 | 1953 | passed | 8 carriages 387135+387141 |
| WTTThe permanent working timetable | 1955½ | London Paddington | Swansea | 1 | cancelled | ||
| VSTPVery short term plan, created on or near the day | 1955½ | London Paddington | Reading | 1 | 1956 | passed | |
| WTTThe permanent working timetable | 1956 | Abbey Wood (Elizabeth line) | Heathrow Terminal 4 | 3 | 1956 | departed | 9 carriages 345009 |
| WTTThe permanent working timetable | 1958½ | Bristol Temple Meads | London Paddington | 2 | 2014 | passed+17 | 9 carriages 802108 |
| WTTThe permanent working timetable | 2000 | Heathrow Terminal 4 | Abbey Wood (Elizabeth line) | 4 | 2000 | departed | 9 carriages 345061 |
| WTTThe permanent working timetable | 2000½ | London Paddington | Hereford | 1 | cancelled | ||
| WTTThe permanent working timetable | 2001 | Abbey Wood (Elizabeth line) | Reading | 3 | 2002 | departed | 9 carriages 345054 |
| WTTThe permanent working timetable | 2003 | London Paddington | Heathrow Terminal 5 | 1 | 2001 | passed | 8 carriages 387130+387137 |
| WTTThe permanent working timetable | 2004 | Heathrow Terminal 5 | Shenfield | 4 | 2003 | passed | 9 carriages 345038 |
| WTTThe permanent working timetable | 2005 | Carmarthen | London Paddington | 2 | cancelled | ||
| WTTThe permanent working timetable | 2007 | Acton T.C. | Langley Reception Sidings | 3 | |||
| WTTThe permanent working timetable | 2007 | Newhaven Marine Ag Tml Dbc | Langley Reception Sidings | 3 | 2006 | passed | |
| WTTThe permanent working timetable | 2007½ | Cricklewood Aggregates Dbc | Westbury Down T.C. | 3 | |||
| WTTThe permanent working timetable | 2008 | Heathrow Terminal 5 | London Paddington | 2 | 2008 | passed | 8 carriages 387134+387138 |
| WTTThe permanent working timetable | 2008 | Reading | Abbey Wood (Elizabeth line) | 4 | 2008 | departed | 9 carriages 345002 |
| VSTPVery short term plan, created on or near the day | 2010 | Reading | London Paddington | 2 | 2024 | passed+15 | 8 carriages 387149+387157 |
| WTTThe permanent working timetable | 2010½ | London Paddington | Plymouth | 1 | 2010 | passed | 10 carriages 802018+802022 |
| WTTThe permanent working timetable | 2011 | Abbey Wood (Elizabeth line) | Heathrow Terminal 4 | 3 | 2012 | departed | 9 carriages 345070 |
| WTTThe permanent working timetable | 2011 | Colnbrook Baa GBRF | Grain Oil Terminal GBRF | 4 | |||
| WTTThe permanent working timetable | 2012 | Plymouth | London Paddington | 2 | 2012 | passed | 10 carriages 802006+802007 |
| WTTThe permanent working timetable | 2013½ | London Paddington | Newbury | 1 | 2012 | passed | 4 carriages 387150 |
| WTTThe permanent working timetable | 2015 | Heathrow Terminal 4 | Abbey Wood (Elizabeth line) | 4 | 2015 | departed | 9 carriages 345001 |
| WTTThe permanent working timetable | 2016 | Abbey Wood (Elizabeth line) | Maidenhead | 3 | 2016 | departed | 9 carriages 345015 |
| VSTPVery short term plan, created on or near the day | 2016 | London Paddington | Reading | 1 | 2015 | passed | 8 carriages 387143+387158 |
| WTTThe permanent working timetable | 2018 | London Paddington | Heathrow Terminal 5 | 1 | 2018 | passed | 8 carriages 387135+387141 |
| WTTThe permanent working timetable | 2018½ | Worcester Foregate Street | London Paddington | 2 | cancelled | 5 carriages 800024 | |
| WTTThe permanent working timetable | 2019½ | Shenfield | Heathrow Terminal 5 | 3 | 2018 | passed | 9 carriages 345030 |
| WTTThe permanent working timetable | 2024½ | Heathrow Terminal 5 | London Paddington | 2 | 2022 | passed-2 | 8 carriages 387131+387139 |
| WTTThe permanent working timetable | 2025 | Maidenhead | Abbey Wood (Elizabeth line) | 4 | 2025 | departed | 9 carriages 345026 |
| WTTThe permanent working timetable | 2026 | Abbey Wood (Elizabeth line) | Heathrow Terminal 4 | 3 | 2026 | departed | 9 carriages 345050 |
| WTTThe permanent working timetable | 2027½ | Reading | Old Oak Depot | 4 | 2017 | passed-10 | 9 carriages 345062 |
| WTTThe permanent working timetable | 2028½ | Allington Hanson Agg | Whatley Quarry F Liner Hh | 3 | |||
| WTTThe permanent working timetable | 2030 | Heathrow Terminal 4 | Abbey Wood (Elizabeth line) | 4 | 2030 | departed | 9 carriages 345045 |
| WTTThe permanent working timetable | 2031 | Abbey Wood (Elizabeth line) | Reading | 3 | 2030 | departed | 9 carriages 345051 |
| WTTThe permanent working timetable | 2033 | London Paddington | Heathrow Terminal 5 | 1 | 2032 | passed | 8 carriages 387134+387138 |
| WTTThe permanent working timetable | 2034 | Heathrow Terminal 5 | Shenfield | 4 | 2033 | passed | 9 carriages 345035 |
| WTTThe permanent working timetable | 2037½ | London Paddington | Weston-super-Mare | 1 | 2047 | passed+11 | 9 carriages 802108 |
| WTTThe permanent working timetable | 2038 | Colnbrook Lafarge GBRF | Avonmouth West Wharf GBRF | 3 | |||
| WTTThe permanent working timetable | 2038½ | Heathrow Terminal 5 | London Paddington | 2 | 2036 | passed | 8 carriages 387130+387137 |
| WTTThe permanent working timetable | 2039 | Reading | Abbey Wood (Elizabeth line) | 4 | 2044 | departed+5 | 9 carriages 345019 |
| VSTPVery short term plan, created on or near the day | 2041 | Reading | London Paddington | 2 | 2041 | passed | 4 carriages 387142 |
| WTTThe permanent working timetable | 2041 | Abbey Wood (Elizabeth line) | Heathrow Terminal 4 | 3 | 2042 | departed | 9 carriages 345063 |
| WTTThe permanent working timetable | 2045 | Abbey Wood (Elizabeth line) | Maidenhead | 3 | 2047 | departed | 9 carriages 345011 |
| WTTThe permanent working timetable | 2045 | Heathrow Terminal 4 | Abbey Wood (Elizabeth line) | 4 | 2048 | departed+3 | 9 carriages 345009 |
| VSTPVery short term plan, created on or near the day | 2046 | London Paddington | Reading | 1 | 2049 | passed+4 | 8 carriages 387149+387157 |
| WTTThe permanent working timetable | 2047½ | Westbury Down T.C. | Willesden Dc Rail Sidings | 4 | cancelled | ||
| WTTThe permanent working timetable | 2047½ | Merehead Quarry (Fhh) | Willesden Dc Rail Sidings | 4 | 2039 | passed-7 | |
| WTTThe permanent working timetable | 2048 | London Paddington | Heathrow Terminal 5 | 1 | 2051 | passed+4 | 8 carriages 387131+387139 |
| WTTThe permanent working timetable | 2049 | Shenfield | Heathrow Terminal 5 | 3 | 2049 | passed | 9 carriages 345052 |
| WTTThe permanent working timetable | 2049½ | Banbury | London Paddington | 2 | 2049 | passed | |
| VSTPVery short term plan, created on or near the day | 2049½ | Reading | London Paddington | 2 | cancelled | 9 carriages 800302 | |
| WTTThe permanent working timetable | 2054½ | Heathrow Terminal 5 | London Paddington | 2 | 2052 | passed | 8 carriages 387135+387141 |
| VAROverlay: a short-term plan replacing the timetable for this date | 2055½ | London Paddington | Swansea | 1 | cancelled | ||
| WTTThe permanent working timetable | 2056 | Abbey Wood (Elizabeth line) | Heathrow Terminal 4 | 3 | 2056 | departed | 9 carriages 345057 |
Italic estimated timing, bold is actual.
Updated 08:12