The lifts are out of order between platform 5 and the footbridge at Stevenage station.
Stevenage SVG
| Time | To | Platform | Expected | Status | Formation |
|---|---|---|---|---|---|
| 0149 | Royston | 4 | 8 carriages | ||
| 0210 | Peterborough | 4 | 8 carriages |
Italic estimated timing, bold is actual.
Updated 01:33