Operators → London North Eastern Railway
How is London North Eastern Railway running?
Running with heavy delays. In the last 60 minutes, 74% of 77 station calls were on time. Today so far, 167 trains have arrived, 81.4% on time. Which trains were late or cancelled
81.4%On timeof those that arrived
167Trains tracked167 arrived, 0 did not
31Latemore than 5 mins late0Did not run as planned0 cancelled, 0 short83Unitsin the register58Seen todayunits that have moved
In the last hour: 77 reports, averaging 4.3 min late.
Punctuality each of the last 14 days
81.4% today, against 82% over the 13 days before it.
Busiest routes booked passenger trains a day, last 7 days
Why trains were cancelled last 7 days
| Reason | Trains |
|---|---|
| Points failure (including no fault found) | 7 |
| Late arrival of booked inward stock | 2 |
| External trees, buildings or structures encroaching or falling onto infrastructure | 1 |
Fleet
Vehicles under construction or in testing 10
- Under Construction
- 897001, 897002, 897003, 897004, 897005, 897006, 897007, 897008, 897009, 897010