The railway on 13th October 2026

TrainTimesLive
Menu Close menu

13th October 2026 still running

33,783Trains22,915 carrying passengers
92.6%On timeof those that arrived
0.2 minAverage delayat their last call
23Cancelledplanned ones included
3Part cancelledran for only part of the journey
–Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 33 33 90.9% 0.4 min
Other (5 min) 76 76 93.4% 0.1 min

Cancellations

KindTrains Share
Reported by Darwin 19 82.6%
Attributed 3 13%
Planned 1 4.3%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 33.3% (21)
Delays not investigated by Network Rail OU 28.6% (18)
WTT Schedule or LTP process including incorrect simplifiers QA 7.9% (5)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 4.8% (3)
Uninvestigated Cancellations System Roll-Ups only ZW 4.8% (3)
Train crew not available including after rest FE 3.2% (2)
Late arrival of booked inward stock YI 1.6% (1)
Diesel loco failure, defect, attention MC 1.6% (1)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 1.6% (1)
Trespass including non-intentional XA 1.6% (1)
Train cancelled or delayed at Train Operator's request TB 1.6% (1)
Depot operating problem MU 1.6% (1)
Possession over-run from planned work I5 1.6% (1)
Uninvestigated Late Start System Roll-Ups only ZX 1.6% (1)
Fatalities or injuries caused by being hit by train XC 1.6% (1)
Trespass including non-intentional XA 1.6% (1)
Late presentation from the continent TN 1.6% (1)

All trains in the network

StateAll Passenger
Planned 32,189 22,701
Activated 693 82
Arrived 524 111
En route 314 16
Cancelled 63 5