1S03 0548 London King's Cross to Aberdeen

TrainTimesLive
Menu Close menu

25th September 2026 Detailed View

05:48 – London King's Cross → Aberdeen Arrived +16 Late operated by London North Eastern Railway

This service has been delayed by a fault with the signalling system.

electric for 4h49 · diesel from Haymarket for 2h26

Reported as far as Aberdeen · 21 of 21 stops made · 520 of 520 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

Wheelchair spaces Catering Quiet coach Cycle spaces First class

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
KGX London King's Cross 7 0548 0548 ·on time
SVG Stevenage picks up passengers only 3 0608½ 0610 0608 0610 ·on time
PBO Peterborough 4 0639 0640 0645 0647 +7
GRA Grantham 2 0658 0659 0705 0708 +9
NNG Newark North Gate 1 0710 0712 0718 0719 +7
RET Retford 2 0725 0726 0732 0733 +7
DON Doncaster 4 0740 0742 0747 0748 +6
YRK York 10 0802 0806 0808 0811 +5
DAR Darlington 4 0832 0834 0837 0839 +5
NCL Newcastle 2 0900 0903 0906 0909 +6
BWK Berwick-upon-Tweed 2 0945 0947 0951 0954 +7
EDB Edinburgh 19 was 2 1028 1031 1036 1040 +9
HYM Haymarket Pathed as Class 800 on diesel at 100mph from here 2 1035 1037 1044 1046 +9
INK Inverkeithing 2 1049 1051 1104 1106 +15
KDY Kirkcaldy 2 1106 1108 1122 1124 +16
LEU Leuchars 2 1131 1132 1147 1149 +17
DEE Dundee 4 1146 1147 1202 1206 +19
ARB Arbroath 2 1203 1204 1222 1224 +20
MTS Montrose 2 1218 1220 1237 1238 +18
STN Stonehaven 2 1241 1243 1259 1300 +17
ABD Aberdeen 5 1303 1316 +16

Italic estimated timing, bold is actual.