1A25 1435 Harrogate to London King's Cross

TrainTimesLive
Menu Close menu

This is the 1A25 1435 Harrogate to London King's Cross on 13th September 2026. See today's trains from Harrogate around 1435 →

13th September 2026 Detailed View

14:35 – Harrogate → London King's Cross Arrived -1 Early operated by London North Eastern Railway

diesel for 35 min · electric from Leeds for 2h26

Reported as far as London King's Cross · 8 of 8 stops made · 204 of 204 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

First class Wheelchair spaces Cycle spaces Catering

Direction of travel: the leading coach is at the right of this diagram

Catering First class Cycle spaces Wheelchair spaces

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGT Harrogate 3 1435 1435 ·on time
HRS Horsforth picks up passengers only 1 1451½ 1453 1451 1452 -1
LDS Leeds Pathed as Class 800 on electric at 125mph from here 6 1503 1510 1501 1512 +2
WKF Wakefield Westgate 1 1521 1522 1523 1524 +2
DON Doncaster 1 1539 1541 1541 1542 +1
NNG Newark North Gate 2 1603 1604 1603 1604 ·on time
SVG Stevenage sets down passengers only 2 1659 1700½ 1657 1659 -1
KGX London King's Cross 3 was 5 1736 1733 -1

Italic estimated timing, bold is actual.