This is the 1A25 1435 Harrogate to London King's Cross on 1st November 2026. See today's trains from Harrogate around 1435 →
1st November 2026 Detailed View
14:35 – Harrogate → London King's Cross Arrived -1 Early operated by London North Eastern Railway
diesel for 35 min · electric from Leeds for 2h18
Reported as far as London King's Cross · 8 of 8 stops made · 204 of 204 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Harrogate → Leeds
1 of 2
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HGT Harrogate | 3 | 1435 | 1435 | ·on time | ||
| HRS Horsforth picks up passengers only | 1 | 1451½ | 1453 | 1452 | 1454 | +1 |
| LDS Leeds Pathed as Class 800 on electric at 125mph from here | 6 | 1503 | 1510 | 1503 | 1511 | +1 |
| WKF Wakefield Westgate | 1 | 1521 | 1522 | 1522 | 1525 | +3 |
| DON Doncaster sets down passengers only | 3 was 1 | 1539 | 1541 | 1544 | 1546 | +5 |
| NNG Newark North Gate | 2 | 1603 | 1604 | 1607 | 1609 | +5 |
| SVG Stevenage sets down passengers only | 2 | 1659 | 1700½ | 1700 | 1702 | +2 |
| KGX London King's Cross | 5 | 1728 | 1725 | -1 |
Italic estimated timing, bold is actual.
Route map
Straight lines between stops, not the track itself. Click the map to zoom and pan; on a phone, use two fingers.