1A25 1435 Harrogate to London King's Cross

TrainTimesLive
Menu Close menu

This is the 1A25 1435 Harrogate to London King's Cross on 1st November 2026. See today's trains from Harrogate around 1435 →

1st November 2026 Detailed View

14:35 – Harrogate → London King's Cross Arrived -1 Early operated by London North Eastern Railway

diesel for 35 min · electric from Leeds for 2h18

Reported as far as London King's Cross · 8 of 8 stops made · 204 of 204 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

First class Wheelchair spaces Cycle spaces Catering

Direction of travel: the leading coach is at the right of this diagram

Catering First class Cycle spaces Wheelchair spaces

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
HGT Harrogate 3 1435 1435 ·on time
HRS Horsforth picks up passengers only 1 1451½ 1453 1452 1454 +1
LDS Leeds Pathed as Class 800 on electric at 125mph from here 6 1503 1510 1503 1511 +1
WKF Wakefield Westgate 1 1521 1522 1522 1525 +3
DON Doncaster sets down passengers only 3 was 1 1539 1541 1544 1546 +5
NNG Newark North Gate 2 1603 1604 1607 1609 +5
SVG Stevenage sets down passengers only 2 1659 1700½ 1700 1702 +2
KGX London King's Cross 5 1728 1725 -1

Italic estimated timing, bold is actual.