1D03 0640 London King's Cross to Harrogate

TrainTimesLive
Menu Close menu

This is the 1D03 0640 London King's Cross to Harrogate on 27th August 2026. See today's trains from London King's Cross around 0640 →

27th August 2026 Detailed View

06:40 – London King's Cross → Harrogate Arrived +8 Late operated by London North Eastern Railway

This service has been delayed by a fault with the signalling system.

Reported off its booked route at Whitehall Junction. The calling pattern below is the route it was booked over.

electric for 2h18 · diesel from Leeds for 31 min

Reported as far as Harrogate · 8 of 8 stops made · 204 of 204 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

Wheelchair spaces Catering Quiet coach Cycle spaces First class

Direction of travel: the leading coach is at the right of this diagram

First class Wheelchair spaces Cycle spaces Quiet coach Catering

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
KGX London King's Cross 8 0640 0639 -1
SVG Stevenage picks up passengers only 3 0659½ 0701 0658 0700 -1
NNG Newark North Gate 1 0755 0756 0800 0802 +6
DON Doncaster 8 0818 0820 0823 0825 +5
WKF Wakefield Westgate 2 0835 0837 0845 0847 +10
LDS Leeds Pathed as Class 800 on diesel at 100mph from here 6 0850 0858 0859 0904 +6
HRS Horsforth sets down passengers only 2 0906 0908 0914 0915 +7
HGT Harrogate 3 0929 0935 +8

Italic estimated timing, bold is actual.