2B10 1500 Cheltenham Spa to Swindon

TrainTimesLive
Menu Close menu

This is the 2B10 1500 Cheltenham Spa to Swindon on 13th September 2026. See today's trains from Cheltenham Spa around 1500 →

13th September 2026 Detailed View

15:00 – Cheltenham Spa → Swindon Arrived +1 Late operated by Great Western Railway

Reported as far as Swindon · 6 of 6 stops made · 43 of 43 miles

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
CNM Cheltenham Spa 1 1500 1459 -1
GCR Gloucester 1 was 2 1509 1513 1508 1515 ·on time
SHU Stonehouse 1 1526 1526 1527 1529 +3
STD Stroud 1 1530 1531 1532 1534 +3
KEM Kemble 1 1545 1546 1547 1548 +2
SWI Swindon 1 1559 1600 +1

Italic estimated timing, bold is actual.