5S00 0446 Brighton Down Siding to Brighton

TrainTimesLive
Menu Close menu

16th September 2026

04:46 – Brighton Down Siding → Brighton Arrived -31 Early operated by Thameslink

Empty coaching stock not available to passengers

Reported as far as Brighton · 2 of 2 stops made · 1 of 1 miles

Formation Class 700

Direction of travel: the leading coach is at the right of this diagram

Calling pattern Timing points only — this train makes no public stops

Calling pattern, including passing points
Booked Actual Route
Location PlatformPlat arrdep arrdep Status Line Path
XBP Brighton Down Siding not advertised 1S 0446 0418 -28
Brighton Reception Road pass operational stop 04530453 pass0423 -30
BTN Brighton not advertised 5 0456 0425 -31

Italic estimated timing, bold is actual.