Operators → Thameslink
How is Thameslink running?
Running with heavy delays. In the last 60 minutes, 83.9% of 682 station calls were on time. Today so far, 468 trains have arrived, 91% on time; 9 cancelled and 68 part cancelled. Which trains were late or cancelled
91%On timeof those that arrived
546Trains tracked468 arrived, 78 did not
42Latemore than 5 mins late78Did not run as planned9 cancelled, 68 part cancelled, 1 short115Unitsin the register106Seen todayunits that have moved
In the last hour: 682 reports, averaging 2.6 min late, 2 part cancelled.
Punctuality each of the last 14 days
91% today, against 89.8% over the 13 days before it.
Busiest routes booked passenger trains a day, last 7 days
Why trains were cancelled last 7 days
| Reason | Trains |
|---|---|
| Train-crew rostering problem | 48 |
| Driver | 41 |
| Train cancelled or delayed at Train Operator's request | 25 |
| Telecom equipment failure (including no fault found) | 13 |
| Diesel loco failure, defect, attention | 13 |
| Track circuit failure (including no fault found) | 10 |
| Brake and brake system faults including wheel flats | 10 |
| Track defects other than rail defects | 9 |