19th September 2026
05:04 – Brighton Down Siding → Brighton Arrived -4 Early operated by Thameslink
Empty coaching stock not available to passengers
Reported as far as Brighton · 2 of 2 stops made · 1 of 1 miles
Formation Class 700
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| XBP Brighton Down Siding not advertised | 2 | 0504 | 0502 | -2 | ||
| Brighton Reception Road pass operational stop | 05110511 | pass0508 | -3 | |||
| BTN Brighton not advertised | 5 | 0514 | 0510 | -4 | ||
Italic estimated timing, bold is actual.