2B09 1400 Cheltenham Spa to Swindon

TrainTimesLive
Menu Close menu

This is the 2B09 1400 Cheltenham Spa to Swindon on 13th September 2026. See today's trains from Cheltenham Spa around 1400 →

13th September 2026 Detailed View

14:00 – Cheltenham Spa → Swindon Arrived -1 Early operated by Great Western Railway

Reported as far as Swindon · 6 of 6 stops made · 43 of 43 miles

Formation Class 802 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram
Direction of travel: the leading coach is at the right of this diagram

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
CNM Cheltenham Spa 1 1400 1359 -1
GCR Gloucester 1 was 2 1409 1417 1408 1417 -2
SHU Stonehouse 1 1430 1430 1428 1430 ·on time
STD Stroud 1 1434 1435 1434 1436 +1
KEM Kemble 1 1450 1450 1448 1450 ·on time
SWI Swindon 1 1503 1502 -1

Italic estimated timing, bold is actual.