This is the 1B92 1943 London King's Cross to Lincoln on 23rd August 2026. See today's trains from London King's Cross around 1943 →
23rd August 2026 Detailed View
19:43 – London King's Cross → Lincoln Cancelled — Signal failure (including no fault found) operated by London North Eastern Railway
electric for 1h24 · diesel from Newark North Gate for 25 min
Reported as far as Newark North Gate · 4 of 5 stops made · 120 of 137 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
First class Wheelchair spaces Cycle spaces Catering
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| KGX London King's Cross | 1 | 1943 | 1942 | -1 | ||
| PBO Peterborough | 4 | 2033 | 2034 | 2036 | 2038 | +4 |
| GRA Grantham | 2 | 2052 | 2053 | 2055 | 2057 | +4 |
| NNG Newark North Gate Pathed as Class 800 on diesel at 100mph from here | 3 | 2105 | 2107 | 2108 | +3 | |
| LCN Lincoln | 3 | 2132 | 2135 |
Italic estimated timing, bold is actual.