1B92 1943 London King's Cross to Lincoln

TrainTimesLive
Menu Close menu

26th September 2026 Detailed View

19:43 – London King's Cross → Lincoln Planned operated by London North Eastern Railway

electric for 1h28 · diesel from Newark North Gate for 27 min

Not yet reported

Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

First class Wheelchair spaces Cycle spaces Quiet coach Catering

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
KGX London King's Cross 7 1943
PBO Peterborough 4 2033 2034
GRA Grantham 2 2052 2053
NNG Newark North Gate Pathed as Class 800 on diesel at 100mph from here 3 2109 2111
LCN Lincoln 3 2138

Italic estimated timing, bold is actual.