1D30 2009 London King's Cross to Leeds

TrainTimesLive
Menu Close menu

This is the 1D30 2009 London King's Cross to Leeds on 13th September 2026. See today's trains from London King's Cross around 2009 →

13th September 2026 Detailed View

20:09 – London King's Cross → Leeds Arrived +17 Late operated by London North Eastern Railway

This service has been delayed by the train departing late to maintain customer connections.

Reported as far as Leeds · 6 of 6 stops made · 185 of 185 miles

Formation

Direction of travel: the leading coach is at the right of this diagram

Cycle spaces First class Wheelchair spaces Catering Quiet coach

Calling pattern

Location PlatformPlat Booked arr Booked dep Actual arr Actual dep Status
KGX London King's Cross 5 2009 2008 -1
PBO Peterborough 5 2055 2058 2052 2058 ·on time
GRA Grantham 2 2116 2117 2115 2117 ·on time
DON Doncaster 8 was 4 2148 2150 2156 2158 +8
WKF Wakefield Westgate 2 2205 2207 2218 2219 +12
LDS Leeds 9 2223 2238 +17

Italic estimated timing, bold is actual.