23rd September 2026
08:03 – Neville Hill T&R.S.M.D → Bradford Forster Square Arrived -1 Early operated by London North Eastern Railway
Empty coaching stock not available to passengers
Reported as far as Bradford Forster Square · 2 of 2 stops made · 16 of 16 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
Catering First class Cycle spaces Wheelchair spaces
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| XNL Neville Hill T&R.S.M.D not advertised ½ min pathing allowance | 0803 | 0802 | -1 | |||
| Neville H. West Junction pass GLLine | 0805½0805½ | pass0801 | -4 | GL | ||
| Marsh Lane Junction Leeds not advertised operational stop 1 min pathing allowance | 0810½0813 | 0819 | +6 | |||
| LDS Leeds not advertised operational stop DLine | 11 | 08170851 | 08240849 | -2 | D | |
| Leeds West Junction pass DLine | 08520852 | pass0850 | -2 | D | ||
| Whitehall Junction pass DSLine | 0852½0852½ | pass0851 | -1 | DS | ||
| Armley Junction not advertised waits for another train to pass | 08540859½ | 0900 | +1 | |||
| Apperley Junction pass | 0905½0905½ | pass0905 | ·on time | |||
| Dockfield Junction pass | 0908½0908½ | pass0909 | +1 | |||
| SHY Shipley pass 2 min engineering allowance | 4 | 0909½0909½ | pass0910 | +1 | ||
| BDQ Bradford Forster Square not advertised | 2 | 0916 | 0915 | -1 | ||
Italic estimated timing, bold is actual.