5A25 14:23 Harrogate Down Siding to Harrogate

TrainTimesLive
Menu Close menu

14:23 Harrogate Down Siding to Harrogate

5A25Empty coaching stockLNER

Arrived 1 min early5 carriagesClass 800

5A25 · 14:23 – Harrogate Down Siding → Harrogate Arrived -1 Early operated by London North Eastern Railway

Journey

WTTThe permanent working timetableMore in the glossary Pathed as Class 800 on diesel at 100 mph

Reported as far as Harrogate · 2 of 2 stops made · 0 of 0 miles

Carriages 5 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley

Direction of travel: the leading coach is at the right of this diagram

Catering First class Cycle spaces Wheelchair spaces

Calling points Timing points only — this train makes no public stops

Calling pattern, including passing points
Formed from 5D11 from Harrogate arrived 13:39 empty stock 800209
WorkingThe railway's own timetable, to the half minute: what drivers and signallers run to. It lists every junction and station the train passes, and can differ from the planned time by a minute or so. LiveUp to where the train is now, the times it was reported. Beyond it, the times it is expected, in italics. Updates every 30 seconds. Route
Location PlatformPlat ArrDep ArrDep Late Line Path
Harrogate Down Siding not advertised 14:23 14:23 On time
HGT Harrogate not advertised 3 14:25 14:24 -1
Forms 1A25 to London King's Cross departs 14:33 800209