25th September 2026 Follow
19:40 – Harrogate → Neville Hill T&R.S.M.D Arrived -14 Early operated by London North Eastern Railway
Empty coaching stock not available to passengers
Reported as far as Neville Hill T&R.S.M.D · 2 of 2 stops made · 20 of 20 miles
Formation Class 800 Air conditioningWi-FiPower socketsToiletsDisabled accessCycle spacesTrolley
First class Wheelchair spaces Cycle spaces Quiet coach Catering
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| HGT Harrogate not advertised | 3 | 1940 | 1942 | +2 | ||
| Rigton Lc pass | 19481948 | pass1951 | +3 | |||
| HRS Horsforth pass 1 min engineering, ½ min pathing allowance | 1 | 19561956 | pass1959 | +4 | ||
| Armley Junction pass UHLine | 20022002 | pass2004 | +2 | UH | ||
| Leeds West Junction pass BLine | 2003½2003½ | pass2006 | +3 | B | ||
| LDS Leeds not advertised operational stop | 8 | 20052020 | 20082011 | -9 | ||
| Marsh Lane Junction Leeds pass GLLine | 20232023 | pass2014 | -9 | GL | ||
| Neville H. West Junction pass | 20262026 | passno report | ||||
| XNL Neville Hill T&R.S.M.D not advertised | 2030 | 2016 | -14 | |||
Italic estimated timing, bold is actual.