28th August 2026
10:47 – Norwich C.Pt. T.&R.S.M.D → Colchester C.S.D. Planned operated by Greater Anglia
Empty coaching stock not available to passengers
No movement reports · booked away 1047 · either it has not started, or its reports are not reaching us
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| XNC Norwich C.Pt. T.&R.S.M.D not advertised | 1047 | |||||
| Thorpe Junction pass CLine | 1056½1056½ | C | ||||
| NRW Norwich not advertised operational stop, reverses here | 4 | 10581105 | ||||
| Thorpe Junction pass | 11061106 | |||||
| Trowse Swing Bridge pass | 1106½1106½ | |||||
| Trowse Junction pass DMLine | 1107½1107½ | DM | ||||
| Trowse Lakenham Junction pass passes another train on the single line | 11081108 | |||||
| Flordon pass 1 min pathing allowance | 11131113 | |||||
| DIS Diss pass 1 min pathing allowance | 11211121 | |||||
| Haughley Junction pass 2 min pathing allowance | 11291129 | |||||
| SMK Stowmarket pass | 1 | 1132½1132½ | ||||
| Claydon pass 1 min engineering allowance | 1137½1137½ | |||||
| Ipswich Europa Junction pass 2 min pathing allowance | 1140½1140½ | |||||
| Ipswich East Suffolk Junction pass UMLine | 11431143 | UM | ||||
| IPS Ipswich not advertised operational stop, crew changed ULLine | 2 | 11451149 | UL | |||
| Ipswich Halifax Junction pass | 1150½1150½ | |||||
| MNG Manningtree pass 1 min engineering, 2 min pathing allowance | 2 | 1156½1156½ | ||||
| COL Colchester not advertised operational stop, waits for another train to pass DPLLine | 1 | 12071208 | DPL | |||
| XLG Colchester C.S.D. not advertised | 1213 | |||||
Italic estimated timing, bold is actual.