Operators → Greater Anglia
How is Greater Anglia running?
Running with minor delays. In the last 60 minutes, 93.6% of 562 station calls were on time. Today so far, 1,102 trains have arrived, 96.2% on time; 4 cancelled and 12 part cancelled. Which trains were late or cancelled · Stansted Express
96.2%On timeof those that arrived
1,118Trains tracked1,102 arrived, 16 did not
42Latemore than 5 mins late16Did not run as planned4 cancelled, 12 part cancelled, 0 short191Unitsin the register161Seen todayunits that have moved
In the last hour: 562 reports, averaging 1.3 min late, 1 part cancelled.
Punctuality each of the last 14 days
96.2% today, against 94.5% over the 13 days before it.
Busiest routes booked passenger trains a day, last 7 days
Why trains were cancelled last 7 days
| Reason | Trains |
|---|---|
| Animal Strike or Incursion within the control of Network Rail | 24 |
| Late arrival of booked inward stock | 23 |
| Driver | 9 |
| Rough ride or bumps reported - cause not known or no fault found | 3 |
| Other technical failures above the Solebar | 3 |
| not yet investigated | 3 |
| Diesel loco failure, defect, attention | 2 |
| Other technical failures below the solebar | 2 |