1st November 2026
12:02 – Tyseley LMD → Worcester Hereford Sdg 5-7 Arrived time not reported +21 Late operated by West Midlands Trains
Empty coaching stock not available to passengers
Reported as far as Worcester Shrub Hill · 1 of 1 stop made · 37 of 38 miles
Formation Class 172
Calling pattern Timing points only — this train makes no public stops
| Booked | Actual | Route | ||||
|---|---|---|---|---|---|---|
| Location | PlatformPlat | arrdep | arrdep | Status | Line | Path |
| XTS Tyseley LMD not advertised | 1202 | 1202 | ·on time | |||
| XOH Small Heath South Junction pass SHLine | 12071207 | pass1209 | +2 | SH | ||
| BMO Birmingham Moor Street pass | 2 | 12101210 | pass1213 | +3 | ||
| BSW Birmingham Snow Hill not advertised operational stop | 1 | 12121214 | 12151215 | +3 | ||
| JEQ Jewellery Quarter pass | 2 was 1 | 1215½1215½ | pass1216 | +2 | ||
| SGB Smethwick Galton Bridge (High Level) pass | 1 | 1218½1218½ | pass1220 | +3 | ||
| SMW Smethwick Junction pass | 12191219 | pass1221 | +2 | |||
| ROW Rowley Regis pass | 1222½1222½ | pass1224 | +3 | |||
| SBJ Stourbridge Junction pass | 3 | 12301230 | pass1232 | +3 | ||
| BKD Blakedown pass | 12331233 | pass1235 | +3 | |||
| KID Kidderminster pass | 2 | 1235½1235½ | pass1238 | +4 | ||
| HBY Hartlebury pass 1 min engineering allowance | 12391239 | pass1241 | +3 | |||
| DTW Droitwich Spa pass | 12451245 | pass1247 | +2 | |||
| Droitwich Spa Signal 68 pass | 1248½1248½ | passno report | ||||
| Worcester Tunnel Junction pass | 1251½1251½ | pass1252 | +1 | |||
| WOS Worcester Shrub Hill not advertised operational stop | 2 | 12531302 | 12531323 | +21 | ||
| Worcester Wylds Lane Junction not advertised operational stop, reverses here DTSLine | UM | 1303½1308½ | 13241325 | DTS | ||
| Worcester Ground Frame not advertised operational stop | 1311½1314½ | 13281329 | ||||
| Worcester Hereford Sdg 5-7 not advertised | 1323 | 1338 | ||||
Italic estimated timing, bold is actual.