Operators → West Midlands Trains
How is West Midlands Trains running?
Running with heavy delays. In the last 60 minutes, 59.3% of 728 station calls were on time, and 1 train was cancelled. Today so far, 1,093 trains have arrived, 93.6% on time; 4 cancelled and 21 part cancelled. Which trains were late or cancelled
93.6%On timeof those that arrived
1,118Trains tracked1,093 arrived, 25 did not
70Latemore than 5 mins late25Did not run as planned4 cancelled, 21 part cancelled, 0 short198Unitsin the register161Seen todayunits that have moved
In the last hour: 728 reports, averaging 5.4 min late, 1 cancelled, 7 part cancelled.
Punctuality each of the last 14 days
93.6% today, against 90.2% over the 13 days before it.
Busiest routes booked passenger trains a day, last 7 days
Why trains were cancelled last 7 days
| Reason | Trains |
|---|---|
| Late arrival of booked inward stock | 107 |
| Driver | 47 |
| Overhead line/3rd rail defect | 16 |
| Failure to maintain vegetation within network boundaries | 14 |
| Axle Counter Failure | 8 |
| Door and Door system faults | 8 |
| Other technical failures above the Solebar | 8 |
| Other technical failures below the solebar | 8 |
Fleet
| Class | Type | Seen today | Seen this month | Out of service | Carriages per unit |
|---|---|---|---|---|---|
| 139/0 | Class 139 | 1/2 | 2/2 | 1 | |
| 150/1 | Class 150 | 2/3 | 3/3 | 2 | |
| 172/0 | Class 172 | 6/8 | 7/8 | 2 | |
| 172/1 | Class 172 | 4/4 | 4/4 | 2 | |
| 172/2 | Class 172 | 11/12 | 12/12 | 2 | |
| 172/3 | Class 172 | 12/15 | 15/15 | 1 | 3 |
| 196/0 | Class 196 | 6/6 | 6/6 | 2 | |
| 196/1 | Class 196 | 9/14 | 13/14 | 4 | |
| 350/1 | Class 350 | 20/30 | 30/30 | 4 | |
| 350/3 | Class 350 | 10/10 | 10/10 | 4 | |
| 350/4 | Class 350 | 10/10 | 10/10 | 4 | |
| 730/0 | Class 730 | 44/48 | 48/48 | 3 | |
| 730/2 | Class 730 | 26/36 | 31/36 | 3 | 5 |