This is the 9S30 1244 Brighton to Cambridge on 10th September 2026. See today's trains from Brighton around 1244 →
10th September 2026 Detailed View
12:44 – Brighton → Cambridge Arrived +4 Late operated by Thameslink
This service has been delayed by a safety inspection of the track.
Reported as far as Cambridge · 20 of 20 stops made · 112 of 112 miles
Formation Class 700
How busy: 28% full. Darwin's own figure for the whole train, not per carriage, reported at Brighton at 02:59.
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| BTN Brighton | 4 | 1244 | 1248 | +4 | ||
| BUG Burgess Hill | 1 | 1254 | 1255 | 1258 | 1259 | +4 |
| HHE Haywards Heath | 3 | 1300 | 1301 | 1304 | 1305 | +4 |
| TBD Three Bridges | 4 | 1309 | 1310 | 1314 | 1316 | +6 |
| GTW Gatwick Airport | 4 | 1315 | 1316 | 1320 | 1321 | +5 |
| ECR East Croydon | 2 | 1331 | 1331 | 1336 | 1337 | +6 |
| LBG London Bridge | 5 | 1345 | 1346 | 1349 | 1350 | +4 |
| BFR London Blackfriars | 2 | 1351 | 1352 | 1354 | 1355 | +3 |
| CTK City Thameslink | 1 | 1353 | 1354 | 1356 | 1357 | +3 |
| ZFD Farringdon | 4 | 1356 | 1356 | 1359 | 1400 | +4 |
| SPL St Pancras International Pathed as Class 700 on electric at 100mph from here | B | 1400 | 1401 | 1403 | 1404 | +3 |
| FPK Finsbury Park | 7 | 1407 | 1408 | 1409 | 1410 | +2 |
| SVG Stevenage | 4 | 1428 | 1429 | 1428 | 1429 | ·on time |
| HIT Hitchin | 2 | 1434 | 1434 | 1433 | 1434 | ·on time |
| LET Letchworth Garden City | 2 | 1439 | 1440 | 1439 | 1439 | ·on time |
| BDK Baldock | 2 | 1443 | 1443 | 1442 | 1443 | ·on time |
| AWM Ashwell & Morden | 2 | 1448 | 1448 | 1447 | 1448 | ·on time |
| RYS Royston | 2 | 1452 | 1453 | 1452 | 1453 | ·on time |
| CMS Cambridge South | 4 | 1505 | 1505 | 1507 | 1509 | +4 |
| CBG Cambridge | 7 | 1509 | 1513 | +4 |
Italic estimated timing, bold is actual.