This is the 9J38 1255 Horsham to Peterborough on 19th September 2026. See today's trains from Horsham around 1255 →
19th September 2026 Detailed View
12:55 – Horsham → Peterborough Arrived +3 Late operated by Thameslink
This service has been delayed by a safety inspection of the track.
Reported as far as Peterborough · 25 of 25 stops made · 118 of 118 miles
Formation Class 700
Calling pattern
| Location | PlatformPlat | Booked arr | Booked dep | Actual arr | Actual dep | Status |
|---|---|---|---|---|---|---|
| HRH Horsham | 3 | 1255 | 1255 | ·on time | ||
| LVN Littlehaven | 1 | 1259 | 1259 | 1258 | 1259 | ·on time |
| IFI Ifield | 1 | 1305 | 1305 | 1304 | 1305 | ·on time |
| CRW Crawley | 1 | 1308 | 1308 | 1307 | 1308 | ·on time |
| TBD Three Bridges | 1 | 1312 | 1313 | 1312 | 1313 | ·on time |
| GTW Gatwick Airport | 1 | 1318 | 1319 | 1318 | 1319 | ·on time |
| HOR Horley | 1 | 1321 | 1321 | 1321 | 1322 | +1 |
| RDH Redhill | 2 | 1329 | 1329 | 1330 | 1330 | +2 |
| MHM Merstham | 1 | 1333 | 1333 | 1334 | 1334 | +1 |
| CDS Coulsdon South | 1 | 1338 | 1339 | 1339 | 1340 | +1 |
| ECR East Croydon | 2 | 1345 | 1345 | 1347 | 1348 | +3 |
| LBG London Bridge | 5 | 1400 | 1401 | 1405 | 1406 | +5 |
| BFR London Blackfriars | 2 | 1406 | 1407 | 1410 | 1411 | +4 |
| CTK City Thameslink | 1 | 1408 | 1409 | 1412 | 1413 | +4 |
| ZFD Farringdon | 4 | 1411 | 1411 | 1415 | 1416 | +5 |
| SPL St Pancras International Pathed as Class 700 on electric at 100mph from here | B | 1415 | 1416 | 1419 | 1420 | +4 |
| FPK Finsbury Park | 7 | 1422 | 1423 | 1426 | 1427 | +4 |
| SVG Stevenage | 4 | 1443 | 1445 | 1446 | 1447 | +2 |
| HIT Hitchin | 2 | 1450 | 1450 | 1452 | 1455 | +5 |
| ARL Arlesey | 2 | 1456 | 1456 | 1500 | 1501 | +5 |
| BIW Biggleswade | 4 | 1501 | 1501 | 1506 | 1507 | +6 |
| SDY Sandy | 2 | 1505 | 1505 | 1511 | 1512 | +7 |
| SNO St Neots | 1 | 1512 | 1513 | 1519 | 1520 | +7 |
| HUN Huntingdon | 3 | 1520 | 1522 | 1528 | 1529 | +7 |
| PBO Peterborough | 2 | 1541 | 1544 | +3 |
Italic estimated timing, bold is actual.