408152 Thameslink
A carriage, type EK2830A, in GT livery. About 9 years old.
In formation with 700152 on 25th September 2026
Recent workings
| Date | Train | Route | Unit | Operator |
|---|---|---|---|---|
| 25th September 2026 | 5R59 2248 | Three Bridges → Three Bridges Tl Up Depot | 700152 | Thameslink |
| 25th September 2026 | 9R59 2059 | Luton → Three Bridges | 700152 | Thameslink |
| 25th September 2026 | 9R58 1856 | Three Bridges → Luton | 700152 | Thameslink |
| 25th September 2026 | 9R43 1632 | Bedford → Three Bridges | 700152 | Thameslink |
| 25th September 2026 | 5R43 1604 | Bedford Jowett Sidings → Bedford | 700152 | Thameslink |
| 25th September 2026 | 5Y82 0927 | Bedford → Bedford Jowett Sidings | 700152 | Thameslink |
| 25th September 2026 | 9T82 0656 | Brighton → Bedford | 700152 | Thameslink |
| 25th September 2026 | 9T01 0412 | Bedford → Brighton | 700152 | Thameslink |
| 25th September 2026 | 9N04 0140 | Three Bridges → Bedford | 700152 | Thameslink |
| 25th September 2026 | 5W04 0126 | Three Bridges Tl Up Depot → Three Bridges | 700152 | Thameslink |
| 24th September 2026 | 5T89 1104 | Three Bridges → Three Bridges Tl Up Depot | 700152 | Thameslink |
| 24th September 2026 | 9T89 1022 | London Bridge → Three Bridges | 700152 | Thameslink |
| 24th September 2026 | 9L88 0914 | East Grinstead → London Bridge | 700152 | Thameslink |
| 24th September 2026 | 9L87 0703 | Bedford → East Grinstead | 700152 | Thameslink |
| 24th September 2026 | 9R00 0412 | Brighton → Bedford | 700152 | Thameslink |
| 23rd September 2026 | 9N21 2344 | Bedford → Brighton | 700152 | Thameslink |
| 23rd September 2026 | 9T62 2058 | Brighton → Bedford | 700152 | |
| 23rd September 2026 | 9T57 1816 | Bedford → Brighton | 700152 | Thameslink |
| 23rd September 2026 | 9T40 1528 | Brighton → Bedford | 700152 | Thameslink |
| 23rd September 2026 | 9T35 1246 | Bedford → Brighton | 700152 | Thameslink |
The unit column is which set it was running in that day, which can change.