This is Maidenhead on 21st September 2026. See Maidenhead live now →
Maidenhead MAI
| STP | Time | From | To | Platform | Actual | Status | Formation |
|---|---|---|---|---|---|---|---|
| WTTThe permanent working timetable | 1850 | Abbey Wood (Elizabeth line) | Reading | 3 | 1857 | departed+7 | 9 carriages 345032 |
| WTTThe permanent working timetable | 1858 | Abbey Wood (Elizabeth line) | Reading | 3 | 1909 | departed+11 | 9 carriages 345015 |
| WTTThe permanent working timetable | 1858 | Reading | Abbey Wood (Elizabeth line) | 4 | 1858 | departed | 9 carriages 345038 |
| WTTThe permanent working timetable | 1902 | Newbury | London Paddington | 2 | 1902 | passed | 8 carriages 387163+387168 |
| WTTThe permanent working timetable | 1902½ | Maidenhead Turnback Line | Old Oak Depot | 4 | 1905 | passed+3 | 9 carriages 345005 |
| WTTThe permanent working timetable | 1903 | London Paddington | Swansea | 1 | 1903 | passed | 10 carriages 800013+800030 |
| VAROverlay: a short-term plan replacing the timetable for this date | 1909 | Penzance | London Paddington | 2 | 1908 | passed | 10 carriages 802003+802009 |
| WTTThe permanent working timetable | 1909 | London Paddington | Didcot Parkway | 1 | 1910 | departed | 12 carriages 387146+387166+387171 |
| WTTThe permanent working timetable | 1912 | Reading | Abbey Wood (Elizabeth line) | 4 | 1912 | departed | 9 carriages 345063 |
| WTTThe permanent working timetable | 1913 | Great Malvern | London Paddington | 2 | 1911 | passed | 5 carriages 800017 |
| WTTThe permanent working timetable | 1913 | London Paddington | Great Malvern | 1 | 1916 | passed+4 | 5 carriages 800024 |
| WTTThe permanent working timetable | 1914 | starts here | Maidenhead Turnback Line | 3 | 1918 | passed+4 | 9 carriages 345051 |
| WTTThe permanent working timetable | 1916 | starts here | Bourne End | 5 | 1916 | departed | 2 carriages 165119 |
| WTTThe permanent working timetable | 1917 | London Paddington | Bristol Temple Meads | 1 | 1918 | passed | 9 carriages 802108 |
| WTTThe permanent working timetable | 1919 | Abbey Wood (Elizabeth line) | Reading | 3 | 1923 | departed+5 | 9 carriages 345004 |
| WTTThe permanent working timetable | 1919 | London Paddington | Plymouth | 1 | 1920 | passed | 9 carriages 800307 |
| WTTThe permanent working timetable | 1921 | Weston-super-Mare | London Paddington | 2 | 1922 | passed | 9 carriages 802101 |
| WTTThe permanent working timetable | 1921 | London Paddington | Bedwyn | 1 | 1922 | passed | 5 carriages 802016 |
| WTTThe permanent working timetable | 1924 | Didcot Parkway | London Paddington | 5 | 1925 | departed | 4 carriages 387162 |
| WTTThe permanent working timetable | 1927 | Abbey Wood (Elizabeth line) | Reading | 3 | 1929 | departed | 9 carriages 345043 |
| WTTThe permanent working timetable | 1927 | Cardiff Central | London Paddington | 2 | 1926 | passed | 9 carriages 800310 |
| WTTThe permanent working timetable | 1929 | London Paddington | Bristol Parkway | 1 | 1928 | passed | 8 carriages 387148+387161 |
| WTTThe permanent working timetable | 1930 | starts here | Abbey Wood (Elizabeth line) | 4 | 1929 | departed | 9 carriages 345051 |
| WTTThe permanent working timetable | 1930½ | Cricklewood Aggregates Dbc | Westbury Down T.C. | 3 | |||
| WTTThe permanent working timetable | 1933 | London Paddington | Swansea | 1 | 1932 | passed | 9 carriages 800311 |
| WTTThe permanent working timetable | 1934½ | Worcester Foregate Street | London Paddington | 2 | 1951 | passed+18 | 5 carriages 802011 |
| WTTThe permanent working timetable | 1939 | London Paddington | Didcot Parkway | 3 | 1939 | departed | 8 carriages 387149+387153 |
| WTTThe permanent working timetable | 1939½ | London Paddington | Oxford | 1 | cancelled | 3 carriages 165114 | |
| WTTThe permanent working timetable | 1941 | Reading | Abbey Wood (Elizabeth line) | 4 | 1943 | departed | 9 carriages 345015 |
| WTTThe permanent working timetable | 1943 | Cheltenham Spa | London Paddington | 2 | 1941 | passed | 5 carriages 800001 |
| WTTThe permanent working timetable | 1945 | starts here | Maidenhead Turnback Line | 3 | 1948 | passed+3 | 9 carriages 345012 |
| WTTThe permanent working timetable | 1945 | London Paddington | Weston-super-Mare | 1 | 1945 | passed | 9 carriages 800308 |
| WTTThe permanent working timetable | 1946 | starts here | Bourne End | 5 | 1946 | departed | 2 carriages 165119 |
| WTTThe permanent working timetable | 1948 | Hayes & H'ton Tarmac Sdgs | Stoke Gifford (Fhh) | 3 | |||
| WTTThe permanent working timetable | 1951 | Bristol Temple Meads | London Paddington | 2 | 1955 | passed+5 | 9 carriages 800320 |
| WTTThe permanent working timetable | 1951 | London Paddington | Worcester Shrub Hill | 1 | 1953 | passed+3 | 5 carriages 802001 |
| WTTThe permanent working timetable | 1955 | Didcot Parkway | London Paddington | 4 | 1957 | departed | 8 carriages 387155+387158 |
| WTTThe permanent working timetable | 1956 | Abbey Wood (Elizabeth line) | Reading | 3 | 2001 | departed+5 | 9 carriages 345046 |
| WTTThe permanent working timetable | 1957 | Reading | Maidenhead Carriage Sdgs | 5 | 1954 | passed-3 | 9 carriages 345032 |
| WTTThe permanent working timetable | 1957½ | Carmarthen | London Paddington | 2 | 2006 | passed+10 | 5 carriages 800005 |
| WTTThe permanent working timetable | 2000 | London Paddington | Didcot Parkway | 3 | 2004 | departed+4 | 8 carriages 387163+387168 |
| WTTThe permanent working timetable | 2000 | starts here | Abbey Wood (Elizabeth line) | 4 | 2000 | departed | 9 carriages 345012 |
| WTTThe permanent working timetable | 2003 | London Paddington | Swansea | 1 | 2004 | passed | 10 carriages 800004+800031 |
| WTTThe permanent working timetable | 2003 | Reading | Old Oak Depot | 4 | 2003 | passed | 9 carriages 345004 |
| WTTThe permanent working timetable | 2004½ | Plymouth | London Paddington | 2 | 2038 | passed+35 | 10 carriages 802013+802020 |
| WTTThe permanent working timetable | 2005 | Wembley Receptions 1-7 | Whatley Quarry F Liner Hh | 3 | 2007 | passed+3 | |
| WTTThe permanent working timetable | 2005 | Wembley Receptions 1-7 | Merehead Quarry (Fhh) | 3 | |||
| WTTThe permanent working timetable | 2008 | London Paddington | Hereford | 1 | 2007 | passed | 9 carriages 800314 |
| WTTThe permanent working timetable | 2011 | Worcester Foregate Street | London Paddington | 2 | 2016 | passed+6 | 5 carriages 800008 |
| WTTThe permanent working timetable | 2012 | Reading | Abbey Wood (Elizabeth line) | 4 | 2012 | departed | 9 carriages 345043 |
| WTTThe permanent working timetable | 2013 | starts here | Maidenhead Turnback Line | 3 | 2021 | passed+8 | 9 carriages 345011 |
| WTTThe permanent working timetable | 2015 | London Paddington | Bristol Temple Meads | 1 | 2014 | passed | 9 carriages 802101 |
| WTTThe permanent working timetable | 2018 | London Paddington | Plymouth | 1 | 2017 | passed | 10 carriages 802003+802009 |
| WTTThe permanent working timetable | 2020 | Merehead Quarry (Fhh) | Willesden Dc Rail Sidings | 4 | 2021 | passed | |
| WTTThe permanent working timetable | 2020 | Westbury Down T.C. | Willesden Dc Rail Sidings | 4 | cancelled | ||
| WTTThe permanent working timetable | 2021 | Weston-super-Mare | London Paddington | 2 | 2021 | passed | 9 carriages 800316 |
| VAROverlay: a short-term plan replacing the timetable for this date | 2021 | starts here | Reading | 5 | 2013 | passed-8 | 2 carriages 165119 |
| WTTThe permanent working timetable | 2021½ | London Paddington | Newbury | 1 | 2022 | passed | 4 carriages 387144 |
| WTTThe permanent working timetable | 2026 | Abbey Wood (Elizabeth line) | Reading | 3 | 2031 | departed+5 | 9 carriages 345054 |
| WTTThe permanent working timetable | 2027 | Didcot Parkway | London Paddington | 5 | 2027 | departed | 4 carriages 387169 |
| WTTThe permanent working timetable | 2030 | starts here | Abbey Wood (Elizabeth line) | 4 | 2033 | departed+3 | 9 carriages 345011 |
| WTTThe permanent working timetable | 2031 | London Paddington | Didcot Parkway | 3 | 2037 | departed+8 | 4 carriages 387162 |
| WTTThe permanent working timetable | 2034 | Cricklewood Aggregates Dbc | Westbury Down T.C. | 3 | |||
| WTTThe permanent working timetable | 2037½ | Reading Traincare Depot | London Paddington | 4 | 2040 | passed+3 | 8 carriages 57301+57312+PZ88 |
| WTTThe permanent working timetable | 2038 | starts here | Marlow | 5 | 2039 | departed | 2 carriages 165127 |
| WTTThe permanent working timetable | 2038 | London Paddington | Oxford | 1 | 2038 | passed | 5 carriages 800017 |
| WTTThe permanent working timetable | 2042 | Banbury | London Paddington | 2 | 2041 | passed | 5 carriages 800009 |
| WTTThe permanent working timetable | 2042 | Reading | Abbey Wood (Elizabeth line) | 4 | 2043 | departed | 9 carriages 345046 |
| WTTThe permanent working timetable | 2043 | starts here | Maidenhead Turnback Line | 3 | 2046 | passed+3 | 9 carriages 345057 |
| WTTThe permanent working timetable | 2044½ | Cheltenham Spa | London Paddington | 2 | 2043 | passed | 5 carriages 800021 |
| WTTThe permanent working timetable | 2045 | London Paddington | Weston-super-Mare | 1 | 2045 | passed | 9 carriages 800310 |
| WTTThe permanent working timetable | 2047 | Allington Hanson Agg | Whatley Quarry F Liner Hh | 3 | |||
| WTTThe permanent working timetable | 2049 | London Paddington | Cheltenham Spa | 1 | 2049 | passed | 5 carriages 800001 |
| WTTThe permanent working timetable | 2052 | Bristol Temple Meads | London Paddington | 2 | 2050 | passed | 9 carriages 802105 |
| WTTThe permanent working timetable | 2055 | Didcot Parkway | London Paddington | 5 | 2058 | departed+4 | 8 carriages 387154+387157 |
| WTTThe permanent working timetable | 2055 | Swansea | London Paddington | 2 | 2055 | passed | 9 carriages 802110 |
| WTTThe permanent working timetable | 2056 | Abbey Wood (Elizabeth line) | Reading | 3 | 2056 | departed | 9 carriages 345023 |
| WTTThe permanent working timetable | 2059 | starts here | Abbey Wood (Elizabeth line) | 4 | 2101 | departed | 9 carriages 345057 |
| WTTThe permanent working timetable | 2100 | London Paddington | Didcot Parkway | 3 | 2101 | departed | 8 carriages 387155+387158 |
| VAROverlay: a short-term plan replacing the timetable for this date | 2103 | Barry Docks Dow Chemicals | Tilbury Lct (Flt) | 4 | |||
| VAROverlay: a short-term plan replacing the timetable for this date | 2103 | Barry Docks Dow Chemicals | Tilbury Lct (Flt) | 4 | |||
| VAROverlay: a short-term plan replacing the timetable for this date | 2103 | London Paddington | Swansea | 1 | 2103 | passed | 9 carriages 800320 |
| WTTThe permanent working timetable | 2103½ | Colnbrook Lafarge GBRF | Avonmouth West Wharf GBRF | 3 | |||
| VARNew short-term plan for this date | 2107 | starts here | Reading Traincare Depot | 5 | 2107 | passed | 2 carriages 165122 |
| WTTThe permanent working timetable | 2107 | London Paddington | Great Malvern | 1 | 2106 | passed | 5 carriages 800008 |
| VAROverlay: a short-term plan replacing the timetable for this date | 2109 | Penzance | London Paddington | 2 | 2115 | passed+7 | 9 carriages 800313 |
| WTTThe permanent working timetable | 2111½ | Great Malvern | London Paddington | 2 | 2110 | passed | 5 carriages 802014 |
Italic estimated timing, bold is actual.
Updated 04:12