16th October 2026 still running
33,574Trains22,851 carrying passengers
95.2%On timeof those that arrived
0.7 minAverage delayat their last call
78Cancelledplanned ones included
8Part cancelledran for only part of the journey
136Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Great Northern | 37 | 84.8% | 5 | 4 | 0 | 1.6 min |
| West Midlands Trains | 47 | 89.1% | 5 | 0 | 1 | 1.3 min |
| Great Western Railway | 112 | 92.2% | 7 | 21 | 1 | 0.7 min |
| South Western Railway | 66 | 92.3% | 5 | 1 | 0 | 1.1 min |
| Southern | 100 | 93.9% | 6 | 0 | 2 | 1.1 min |
| Greater Anglia | 74 | 94.5% | 4 | 0 | 1 | on time |
| Elizabeth line | 39 | 94.9% | 2 | 0 | 0 | 0.3 min |
| Merseyrail | 20 | 95% | 1 | 0 | 0 | 0.8 min |
| c2c | 29 | 96.3% | 1 | 2 | 0 | 1.6 min |
| Southeastern | 111 | 96.4% | 4 | 0 | 0 | 0.6 min |
| London Overground | 88 | 96.9% | 2 | 21 | 2 | 0.9 min |
| Northern | 112 | 97.1% | 3 | 10 | 0 | 0.2 min |
| ScotRail | 60 | 98.3% | 1 | 1 | 0 | 1.1 min |
| Transport for Wales | 55 | 100% | 0 | 1 | 0 | 0.1 min early |
| Thameslink | 41 | 100% | 0 | 9 | 1 | 0.4 min |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Long distance (10 min) | 212 | 212 | 98.6% | 0.5 min |
| Other (5 min) | 803 | 801 | 94.3% | 0.7 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 38 | 48.7% |
| Reported by Darwin | 21 | 26.9% |
| Unexplained | 19 | 24.4% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Train cancelled at FOC request or planned not to run | FL | 28.7% (56) |
| Uninvestigated Cancellations System Roll-Ups only | ZW | 15.9% (31) |
| Delays not investigated by Network Rail | OU | 8.2% (16) |
| Exclusion commercially agreed and documented between Network Rail and Train Operator | PL | 7.2% (14) |
| Other technical failures below the solebar | MD | 5.1% (10) |
| Depot operating problem | MU | 4.6% (9) |
| Late arrival of booked inward stock | YI | 3.1% (6) |
| Other technical failures above the Solebar | M8 | 3.1% (6) |
| Engineer's on-track equipment failure outside possession | MV | 2.1% (4) |
| Safety related incident caused by maintenance or infrastructure staff oversight or error | JL | 2.1% (4) |
| Driver | TG | 2.1% (4) |
| Uninvestigated Late Start System Roll-Ups only | ZX | 1.5% (3) |
| Train-crew rostering problem | TI | 1.5% (3) |
| Train cancelled or delayed at Train Operator's request | TB | 1.5% (3) |
| Uninvestigated Cancellations System Roll-Ups only | ZW | 1.5% (3) |
| Driver | TG | 1% (2) |
| Possession over-run from planned work | I5 | 1% (2) |
| Train cancelled at FOC request or planned not to run | FL | 1% (2) |
| Train crew not available including after rest | FE | 1% (2) |
| Uninvestigated Loss in Running System Roll-Up only | ZZ | 0.5% (1) |
| Late arrival of booked inward stock | YI | 0.5% (1) |
| Waiting platform or station congestion or platform alteration | YO | 0.5% (1) |
| Delays not investigated by Network Rail | OU | 0.5% (1) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 0.5% (1) |
| Late arrival of booked inward train-crew | YJ | 0.5% (1) |
| Points failure (including no fault found) | IB | 0.5% (1) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.5% (1) |
| Passenger taken ill on train | VD | 0.5% (1) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 0.5% (1) |
| Other technical failures below the solebar | MD | 0.5% (1) |
| Senior Conductor or Train Manager | TH | 0.5% (1) |
| Possession over-run from planned work | I5 | 0.5% (1) |
| Confirmed train cab based safety system fault including GSM-R | M0 | 0.5% (1) |
| Other technical failures above the Solebar | M8 | 0.5% (1) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Planned | 26,128 | 18,816 |
| Arrived | 3,021 | 1,021 |
| Activated | 2,225 | 1,482 |
| En route | 1,869 | 1,471 |
| Cancelled | 195 | 60 |
| Never activated | 136 | 1 |