How is London Overground running?
Running well. In the last 60 minutes, 98.9% of 1,290 station calls were on time, and 3 trains were cancelled. Today so far, 1,321 trains have arrived, 96.1% on time; 36 cancelled and 29 part cancelled. Which trains were late or cancelled
96.1%On timeof those that arrived
1,386Trains tracked1,321 arrived, 65 did not
51Latemore than 5 mins late65Did not run as planned36 cancelled, 29 part cancelled, 0 short111Unitsin the register0Seen todayunits that have moved
In the last hour: 1,290 reports, averaging 1.1 min late, 3 cancelled.
Punctuality each of the last 14 days
96.1% today, against 94.8% over the 13 days before it.
Busiest routes booked passenger trains a day, last 7 days
Why trains were cancelled last 7 days
| Reason | Trains |
|---|---|
| Late arrival of booked inward stock | 157 |
| Driver | 71 |
| Diesel loco failure, defect, attention | 19 |
| Miscellaneous items on the track or railhead | 18 |
| Time lost en-route believed to be Operator cause and information required from Operator | 15 |
| Points failure (including no fault found) | 14 |
| Bridge Strike | 11 |
| not yet investigated | 10 |