Operators → Merseyrail
How is Merseyrail running?
Running well. In the last 60 minutes, 96.4% of 466 station calls were on time. Today so far, 533 trains have arrived, 97% on time; 2 cancelled and 17 part cancelled. Which trains were late or cancelled
97%On timeof those that arrived
552Trains tracked533 arrived, 19 did not
16Latemore than 5 mins late19Did not run as planned2 cancelled, 17 part cancelled, 0 short53Unitsin the register46Seen todayunits that have moved
In the last hour: 466 reports, averaging 0.6 min late.
Punctuality each of the last 14 days
97% today, against 98.4% over the 13 days before it.
Busiest routes booked passenger trains a day, last 7 days
Why trains were cancelled last 7 days
| Reason | Trains |
|---|---|
| Trespass including non-intentional | 9 |
| Other technical failures below the solebar | 5 |
| Late arrival of booked inward stock | 3 |
| Possession over-run from planned work | 2 |
| Door and Door system faults | 2 |
| Other technical failures above the Solebar | 2 |
| AWS/ATP/TPWS/Train Stop/On-track equipment failure | 1 |
| Planned underpowered or shortformed service or vehicle | 1 |