Merseyrail

TrainTimesLive
Menu Close menu

Operators → Merseyrail

How is Merseyrail running?

Running well. In the last 60 minutes, 96.4% of 466 station calls were on time. Today so far, 533 trains have arrived, 97% on time; 2 cancelled and 17 part cancelled. Which trains were late or cancelled

97%On timeof those that arrived
552Trains tracked533 arrived, 19 did not
16Latemore than 5 mins late19Did not run as planned2 cancelled, 17 part cancelled, 0 short53Unitsin the register
46Seen todayunits that have moved

In the last hour: 466 reports, averaging 0.6 min late.

Punctuality each of the last 14 days

97% today, against 98.4% over the 13 days before it.

  1. 12th September 2026: 96.7% on time of 619 trains
  2. 13th September 2026: 99.4% on time of 324 trains
  3. 14th September 2026: 99.8% on time of 622 trains
  4. 15th September 2026: 99.7% on time of 622 trains
  5. 16th September 2026: 94.7% on time of 632 trains
  6. 17th September 2026: 98.2% on time of 622 trains
  7. 18th September 2026: 98.9% on time of 622 trains
  8. 19th September 2026: 97.3% on time of 619 trains
  9. 20th September 2026: 98.1% on time of 324 trains
  10. 21st September 2026: 99.8% on time of 622 trains
  11. 22nd September 2026: 98.5% on time of 622 trains
  12. 23rd September 2026: 99.7% on time of 622 trains
  13. 24th September 2026: 98.7% on time of 622 trains
  14. 25th September 2026: 97% on time of 552 trains, so far today

Busiest routes booked passenger trains a day, last 7 days

Why trains were cancelled last 7 days

Reason Trains
Trespass including non-intentional 9
Other technical failures below the solebar 5
Late arrival of booked inward stock 3
Possession over-run from planned work 2
Door and Door system faults 2
Other technical failures above the Solebar 2
AWS/ATP/TPWS/Train Stop/On-track equipment failure 1
Planned underpowered or shortformed service or vehicle 1

Fleet

ClassType Seen todaySeen this month Carriages per unit
777/0 Class 777 40/46 43/46 4
777/1 Class 777 6/7 7/7 4