16th October 2026 still running
33,579Trains22,851 carrying passengers
95%On timeof those that arrived
0.9 minAverage delayat their last call
82Cancelledplanned ones included
18Part cancelledran for only part of the journey
203Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop
By operator least punctual first
| Operator | Tracked | On time | Late | Cancelled | Part cancelled | Average delay |
|---|---|---|---|---|---|---|
| Great Northern | 53 | 85.4% | 7 | 4 | 1 | 2.4 min |
| West Midlands Trains | 81 | 87.3% | 10 | 0 | 2 | 2 min |
| South Western Railway | 115 | 89.5% | 12 | 1 | 0 | 1.6 min |
| Great Western Railway | 157 | 91.7% | 11 | 23 | 1 | 1 min |
| c2c | 42 | 92.3% | 3 | 2 | 1 | 2.3 min |
| Southern | 154 | 93.3% | 10 | 0 | 4 | 1.4 min |
| Greater Anglia | 114 | 95.5% | 5 | 0 | 2 | on time |
| London Overground | 138 | 95.6% | 5 | 21 | 3 | 1 min |
| Chiltern Railways | 27 | 96.2% | 1 | 0 | 1 | 0.2 min early |
| TransPennine Express | 27 | 96.2% | 1 | 1 | 0 | 0.5 min |
| Elizabeth line | 62 | 96.8% | 2 | 0 | 0 | 0.3 min |
| Northern | 206 | 96.9% | 6 | 10 | 0 | 0.3 min |
| East Midlands Railway | 33 | 96.9% | 1 | 1 | 0 | 0.8 min |
| Merseyrail | 38 | 97.4% | 1 | 0 | 0 | 0.5 min |
| Southeastern | 168 | 97.6% | 4 | 0 | 1 | 0.6 min |
| Transport for Wales | 90 | 98.9% | 1 | 1 | 0 | on time |
| ScotRail | 125 | 99.2% | 1 | 1 | 0 | 1 min |
| Thameslink | 56 | 100% | 0 | 9 | 2 | 0.7 min |
| Heathrow Express | 20 | 100% | 0 | 0 | 0 | 0.9 min early |
Punctuality
| Trains | Ran | Arrived | On time | Average delay |
|---|---|---|---|---|
| Long distance (10 min) | 369 | 369 | 98.4% | 0.9 min |
| Other (5 min) | 1,308 | 1,302 | 94.1% | 0.9 min |
Cancellations
| Kind | Trains | Share |
|---|---|---|
| Attributed | 41 | 50% |
| Reported by Darwin | 21 | 25.6% |
| Unexplained | 20 | 24.4% |
Why most common first
| Reason | Code | Share |
|---|---|---|
| Train cancelled at FOC request or planned not to run | FL | 28.8% (65) |
| Uninvestigated Cancellations System Roll-Ups only | ZW | 15.5% (35) |
| Delays not investigated by Network Rail | OU | 8% (18) |
| Exclusion commercially agreed and documented between Network Rail and Train Operator | PL | 6.6% (15) |
| Other technical failures below the solebar | MD | 4.4% (10) |
| Depot operating problem | MU | 4% (9) |
| Late arrival of booked inward stock | YI | 2.7% (6) |
| Other technical failures above the Solebar | M8 | 2.7% (6) |
| Safety related incident caused by maintenance or infrastructure staff oversight or error | JL | 1.8% (4) |
| Engineer's on-track equipment failure outside possession | MV | 1.8% (4) |
| Driver | TG | 1.8% (4) |
| Uninvestigated Cancellations System Roll-Ups only | ZW | 1.8% (4) |
| Late arrival of booked inward stock | YI | 1.8% (4) |
| Train-crew rostering problem | TI | 1.3% (3) |
| Train cancelled or delayed at Train Operator's request | TB | 1.3% (3) |
| Passenger taken ill on train | VD | 1.3% (3) |
| Uninvestigated Late Start System Roll-Ups only | ZX | 1.3% (3) |
| Driver | TG | 1.3% (3) |
| Train crew not available including after rest | FE | 0.9% (2) |
| Delays not investigated by Network Rail | OU | 0.9% (2) |
| Senior Conductor or Train Manager | TH | 0.9% (2) |
| Possession over-run from planned work | I5 | 0.9% (2) |
| Cutting or embankment earthslip, rock fall or subsidence | IV | 0.9% (2) |
| Train cancelled at FOC request or planned not to run | FL | 0.9% (2) |
| Time lost en-route believed to be Operator cause and information required from Operator | TO | 0.9% (2) |
| Possession over-run from planned work | I5 | 0.4% (1) |
| Uninvestigated Loss in Running System Roll-Up only | ZZ | 0.4% (1) |
| Other technical failures above the Solebar | M8 | 0.4% (1) |
| Other technical failures below the solebar | MD | 0.4% (1) |
| Delays incurred on non-Network Rail running lines or networks including London Underground | TX | 0.4% (1) |
| Depot operating problem | MU | 0.4% (1) |
| Waiting platform or station congestion or platform alteration | YO | 0.4% (1) |
| Points failure (including no fault found) | IB | 0.4% (1) |
| Confirmed train cab based safety system fault including GSM-R | M0 | 0.4% (1) |
| WTT Schedule or LTP process including incorrect simplifiers | QA | 0.4% (1) |
| Late arrival of booked inward train-crew | YJ | 0.4% (1) |
| Train cancelled or delayed at Train Operator's request | TB | 0.4% (1) |
| FOC Planning issue (not diagramming or rostering) | FH | 0.4% (1) |
All trains in the network
| State | All | Passenger |
|---|---|---|
| Planned | 25,182 | 18,034 |
| Arrived | 3,883 | 1,687 |
| Activated | 2,149 | 1,438 |
| En route | 1,936 | 1,621 |
| Cancelled | 226 | 70 |
| Never activated | 203 | 1 |