Operators → CrossCountry
How is CrossCountry running?
Running with heavy delays. In the last 60 minutes, 53% of 149 station calls were on time. Today so far, 210 trains have arrived, 81% on time; 2 cancelled and 22 part cancelled. Which trains were late or cancelled
81%On timeof those that arrived
234Trains tracked210 arrived, 24 did not
40Latemore than 5 mins late24Did not run as planned2 cancelled, 22 part cancelled, 0 short99Unitsin the register82Seen todayunits that have moved
In the last hour: 149 reports, averaging 8.2 min late, 3 part cancelled.
Punctuality each of the last 14 days
81% today, against 74.6% over the 13 days before it.
Busiest routes booked passenger trains a day, last 7 days
Why trains were cancelled last 7 days
| Reason | Trains |
|---|---|
| Train cancelled or delayed at Train Operator's request | 38 |
| Driver | 36 |
| Late arrival of booked inward stock | 31 |
| External utility incident including gas, water mains and overhead power lines | 25 |
| not yet investigated | 18 |
| Signal failure (including no fault found) | 15 |
| Train Operating Company Directive | 11 |
| Other technical failures above the Solebar | 5 |