The railway on 30th September 2026

TrainTimesLive
Menu Close menu

30th September 2026

34,346Trains23,111 carrying passengers
91.3%On timeof those that arrived
1.8 minAverage delayat their last call
275Cancelledplanned ones included
590Part cancelledran for only part of the journey
1,466Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 26 38.5% 16 0 0 13.8 min
CrossCountry 280 72.5% 70 1 24 7.6 min
Avanti West Coast 317 75.9% 74 1 9 7.1 min
Great Northern 402 78% 70 46 38 4.7 min
London North Eastern Railway 200 78% 44 0 0 6 min
Elizabeth line 696 85.7% 91 29 31 3 min
Southeastern 1,811 86.5% 234 17 58 2.8 min
South Western Railway 1,610 87.5% 194 11 47 2.3 min
East Midlands Railway 501 87.9% 59 3 10 2.7 min
Great Western Railway 1,722 88.6% 191 19 22 2.2 min
Thameslink 651 88.8% 68 13 30 2.6 min
Gatwick Express 72 89.7% 7 3 1 4 min
c2c 365 90% 35 1 13 2.4 min
Northern 2,777 90.5% 257 16 68 1.6 min
TransPennine Express 345 91.5% 28 0 15 2.3 min
West Midlands Trains 1,325 92.3% 97 7 54 1.3 min
Transport for Wales 1,062 92.3% 74 39 66 1.3 min
Southern 1,687 93.3% 110 5 38 1.7 min
Tyne and Wear Metro 87 94.3% 5 0 0 1.2 min
Chiltern Railways 351 95.7% 15 0 2 1.1 min
London Underground 180 96% 6 29 0 0.5 min
Greater Anglia 1,305 96.4% 46 4 13 0.3 min
ScotRail 2,279 97.7% 53 10 11 0.6 min
London Overground 1,601 98.3% 26 14 32 0.7 min
Merseyrail 622 98.5% 9 3 5 on time
Heathrow Express 150 100% 0 0 0 1.3 min
Island Line 52 100% 0 0 0 0.4 min early
South Yorkshire Supertram 36 100% 0 0 0 0.1 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,449 15,449 92.2% 1.2 min
Long distance (10 min) 6,304 6,303 89% 3.5 min

Cancellations

KindTrains Share
Attributed 250 90.9%
Unexplained 21 7.6%
Planned 2 0.7%
Reported by Darwin 2 0.7%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 24.7% (375)
Delays not investigated by Network Rail OU 19.3% (293)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 10.7% (162)
Late arrival of booked inward stock YI 5.4% (82)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 3.8% (58)
Uninvestigated Cancellations System Roll-Ups only ZW 3.1% (47)
Late arrival of booked inward stock YI 2.6% (40)
Train cancelled or delayed at Train Operator's request TB 2.2% (34)
Driver TG 1.4% (22)
Fatalities or injuries caused by being hit by train XC 1.3% (20)
Uninvestigated Cancellations System Roll-Ups only ZW 1.1% (16)
Points failure (including no fault found) IB 1% (15)
Other technical failures below the solebar MD 1% (15)
Other technical failures above the Solebar M8 0.9% (14)
Driver TG 0.9% (13)
Other technical failures above the Solebar M8 0.9% (13)
Other technical failures below the solebar MD 0.9% (13)
Planned underpowered or shortformed service or vehicle MS 0.8% (12)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.7% (11)
Train cancelled or delayed at Train Operator's request TB 0.7% (11)
Depot operating problem MU 0.7% (11)
Points failure (including no fault found) IB 0.7% (10)
Coupler and Coupler system faults MY 0.7% (10)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 0.6% (9)
Cable vandalism or theft XR 0.5% (8)
Trespass including non-intentional XA 0.5% (7)
Signal failure (including no fault found) IA 0.5% (7)
Axle Counter Failure J3 0.4% (6)
Brake and brake system faults including wheel flats MN 0.4% (6)
WTT Schedule or LTP process including incorrect simplifiers QA 0.4% (6)
Fatalities or injuries caused by being hit by train XC 0.4% (6)
Critical Rail Temperature speeds other than buckled rails JH 0.3% (5)
Power supply and distribution system failure IH 0.3% (5)
Train-crew rostering problem TI 0.3% (5)
Senior Conductor or Train Manager TH 0.3% (5)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.3% (5)
Brake and brake system faults including wheel flats MN 0.3% (5)
Overhead line/3rd rail defect I1 0.3% (4)
Delays not investigated by Network Rail OU 0.3% (4)
Animal Strike or Incursion within the control of Network Rail I8 0.3% (4)

All trains in the network

StateAll Passenger
Arrived 28,712 22,147
Planned 2,649 59
Cancelled 1,519 490
Never activated 1,466 415