The railway on 1st October 2026

TrainTimesLive
Menu Close menu

1st October 2026

34,274Trains23,103 carrying passengers
91.4%On timeof those that arrived
1.8 minAverage delayat their last call
307Cancelledplanned ones included
640Part cancelledran for only part of the journey
1,388Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 317 80.5% 61 0 4 6.1 min
Eurostar 27 81.5% 5 0 0 5.1 min
Great Northern 402 82% 65 17 24 3.6 min
CrossCountry 280 82.2% 38 8 59 5.4 min
East Midlands Railway 503 85.8% 68 9 14 3 min
London North Eastern Railway 200 88.1% 23 6 0 3.7 min
Great Western Railway 1,724 88.4% 194 20 25 2 min
Heathrow Express 152 88.7% 17 2 0 2.6 min
Southeastern 1,810 89.5% 186 11 35 2.1 min
Southern 1,687 89.9% 160 44 66 2.3 min
Thameslink 651 89.9% 63 2 24 2.3 min
South Western Railway 1,611 90.2% 152 8 46 1.9 min
Transport for Wales 1,065 90.3% 96 3 71 1.7 min
Northern 2,770 90.5% 253 34 68 1.7 min
Tyne and Wear Metro 94 90.7% 8 6 2 1.3 min
Gatwick Express 72 91.3% 6 2 1 4.8 min
ScotRail 2,278 92.2% 172 19 62 1.5 min
Greater Anglia 1,289 92.2% 94 43 40 1.2 min
c2c 365 93.8% 22 1 10 2 min
West Midlands Trains 1,327 94.9% 65 19 24 0.8 min
Elizabeth line 696 95.9% 28 0 11 0.7 min
TransPennine Express 351 96.4% 12 2 15 1.2 min
Chiltern Railways 350 96.6% 12 0 1 0.6 min
London Overground 1,601 97% 48 9 14 0.9 min
Merseyrail 622 98.5% 9 11 20 0.1 min
London Underground 174 98.7% 2 16 0 0.5 min
Island Line 52 100% 0 0 0 0.4 min early
South Yorkshire Supertram 37 100% 0 0 0 0.1 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,394 15,394 91.9% 1.2 min
Long distance (10 min) 6,266 6,266 90% 3.2 min

Cancellations

KindTrains Share
Attributed 281 91.5%
Unexplained 22 7.2%
Planned 3 1%
Reported by Darwin 1 0.3%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 23.4% (376)
Delays not investigated by Network Rail OU 21.2% (341)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 11.9% (191)
Late arrival of booked inward stock YI 5.4% (87)
Uninvestigated Cancellations System Roll-Ups only ZW 3.4% (54)
Possession over-run from planned work I5 2.2% (36)
Train cancelled or delayed at Train Operator's request TB 2% (32)
Driver TG 1.8% (29)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 1.5% (24)
Points failure (including no fault found) IB 1.4% (23)
Fatalities or injuries caused by being hit by train XC 1.4% (22)
Points failure (including no fault found) IB 1.3% (21)
Uninvestigated Cancellations System Roll-Ups only ZW 1.2% (20)
Driver TG 1.2% (20)
Late arrival of booked inward stock YI 1.2% (19)
Cable vandalism or theft XR 1% (16)
Train cancelled or delayed at Train Operator's request TB 1% (16)
Other Passenger Train Operating Company causes TZ 1% (16)
Track defects other than rail defects IS 0.9% (15)
Possession over-run from planned work I5 0.7% (12)
Other technical failures below the solebar MD 0.7% (12)
Depot operating problem MU 0.7% (11)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (10)
Other technical failures above the Solebar M8 0.6% (10)
Other technical failures below the solebar MD 0.6% (10)
WTT Schedule or LTP process including incorrect simplifiers QA 0.6% (9)
Other technical failures above the Solebar M8 0.6% (9)
Train cancelled at FOC request or planned not to run FL 0.4% (7)
Senior Conductor or Train Manager TH 0.4% (6)
Axle Counter Failure J3 0.4% (6)
Delays not investigated by Network Rail OU 0.4% (6)
Broken/cracked/twisted/buckled/flawed rail IR 0.3% (5)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.3% (5)
Train-crew rostering problem TI 0.3% (5)
Track circuit failure (including no fault found) IC 0.3% (5)
Senior Conductor or Train Manager TH 0.2% (4)
Broken/cracked/twisted/buckled/flawed rail IR 0.2% (4)
Door and Door system faults M7 0.2% (4)
Axle Counter Failure J3 0.2% (4)
Track circuit failure (including no fault found) IC 0.2% (4)

All trains in the network

StateAll Passenger
Arrived 28,661 22,118
Planned 2,619 61
Cancelled 1,606 508
Never activated 1,388 416