5th October 2026

33,492Trains22,900 carrying passengers
93.3%On timeof those that arrived
1.4 minAverage delayat their last call
300Cancelledplanned ones included
544Part cancelledran for only part of the journey
1,294Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 28 42.9% 16 0 0 11.8 min
London North Eastern Railway 199 79.2% 40 1 6 6.7 min
Avanti West Coast 317 79.6% 62 1 12 6.7 min
Gatwick Express 72 84.3% 11 0 2 4.3 min
CrossCountry 279 84.5% 38 7 27 5 min
East Midlands Railway 500 86.7% 64 7 9 2.9 min
TransPennine Express 313 86.7% 38 0 28 3.4 min
Northern 2,747 89% 290 37 68 1.8 min
London Underground 196 89.1% 14 66 1 2 min
Great Northern 396 89.9% 38 11 11 2.2 min
Southern 1,679 91.9% 129 19 67 1.7 min
West Midlands Trains 1,316 93.3% 85 19 23 1.3 min
Great Western Railway 1,713 93.7% 105 27 20 1.1 min
Thameslink 647 93.7% 39 15 15 1.4 min
South Western Railway 1,611 93.9% 95 25 37 1.1 min
Transport for Wales 1,006 94.4% 52 10 75 1 min
Southeastern 1,791 95% 88 10 15 1.4 min
London Overground 1,601 96.5% 53 29 49 0.8 min
Merseyrail 622 96.5% 21 2 18 0.2 min
Tyne and Wear Metro 87 96.5% 3 0 1 1 min
ScotRail 2,277 96.6% 76 7 21 0.7 min
c2c 357 96.6% 12 1 6 1.2 min
Heathrow Express 152 97.4% 4 0 1 0.9 min
Greater Anglia 1,305 97.8% 28 1 21 0.1 min early
Chiltern Railways 346 98% 7 0 0 0.4 min
Elizabeth line 697 98.4% 11 0 6 0.4 min
Island Line 52 100% 0 0 0 0.9 min early
South Yorkshire Supertram 37 100% 0 0 0 0.2 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,307 15,303 93.9% 0.8 min
Long distance (10 min) 6,296 6,296 92% 2.7 min

Cancellations

KindTrains Share
Attributed 286 95.3%
Unexplained 11 3.7%
Planned 2 0.7%
Reported by Darwin 1 0.3%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 21.8% (311)
Delays not investigated by Network Rail OU 14.8% (211)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 11.5% (164)
Late arrival of booked inward stock YI 6.3% (89)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 5% (71)
Driver TG 3.5% (50)
Late arrival of booked inward stock YI 2.7% (38)
Train cancelled or delayed at Train Operator's request TB 2.2% (31)
Uninvestigated Cancellations System Roll-Ups only ZW 1.9% (27)
Depot operating problem MU 1.6% (23)
Other technical failures above the Solebar M8 1.5% (21)
Animal Strike or Incursion within the control of Network Rail I8 1.3% (18)
Fatalities or injuries caused by being hit by train XC 1.3% (18)
Track defects other than rail defects IS 1.1% (16)
Brake and brake system faults including wheel flats MN 1.1% (16)
Door and Door system faults M7 1.1% (15)
National Grid power failure - local area also affected XK 1% (14)
National Grid power failure - local area also affected XK 0.9% (13)
Uninvestigated Cancellations System Roll-Ups only ZW 0.9% (13)
Planned underpowered or shortformed service or vehicle MS 0.8% (11)
Trespass including non-intentional XA 0.7% (10)
Fatalities or injuries caused by being hit by train XC 0.7% (10)
WTT Schedule or LTP process including incorrect simplifiers QA 0.7% (10)
Train cancelled or delayed at Train Operator's request TB 0.6% (9)
Other technical failures above the Solebar M8 0.6% (8)
Bridge Strike XP 0.6% (8)
Engineer's on-track equipment failure outside possession MV 0.6% (8)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.5% (7)
Other FOC causes including mishaps FZ 0.5% (7)
Uninvestigated Late Start System Roll-Ups only ZX 0.5% (7)
Possession over-run from planned work I5 0.4% (6)
Train cancelled at FOC request or planned not to run FL 0.4% (6)
Delays not investigated by Network Rail OU 0.4% (6)
Signal failure (including no fault found) IA 0.4% (5)
Other technical failures below the solebar MD 0.4% (5)
Driver TG 0.4% (5)
Disorder, drunks or trespass VA 0.4% (5)
Train crew not available including after rest FE 0.4% (5)
Points failure (including no fault found) IB 0.4% (5)
Signal failure (including no fault found) IA 0.4% (5)

All trains in the network

StateAll Passenger
Arrived 28,343 21,961
Planned 2,431 58
Cancelled 1,424 493
Never activated 1,294 388