The railway on 16th November 2026

TrainTimesLive
Menu Close menu

16th November 2026

33,666Trains22,941 carrying passengers
88.3%On timeof those that arrived
2.4 minAverage delayat their last call
619Cancelledplanned ones included
1,090Part cancelledran for only part of the journey
539No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 29 34.8% 15 6 0 38 min
Grand Central 20 45% 11 0 0 9.8 min
London North Eastern Railway 199 66.5% 60 6 14 11.2 min
Avanti West Coast 317 70.2% 94 0 2 7.8 min
CrossCountry 282 73.9% 60 16 36 7.9 min
TransPennine Express 314 74.8% 74 5 15 6 min
London Underground 193 79.4% 26 66 1 2.2 min
Southeastern 1,793 80.4% 312 88 113 4.1 min
East Midlands Railway 508 80.6% 90 17 28 3.7 min
Great Northern 398 84.2% 57 15 23 3.2 min
Island Line 66 85.1% 7 27 0 19.1 min
Northern 2,729 85.5% 383 28 67 2.3 min
Elizabeth line 697 87% 84 23 27 1.9 min
c2c 358 87.2% 25 0 162 2.7 min
West Midlands Trains 1,317 87.6% 146 59 82 2.1 min
South Western Railway 1,617 87.8% 185 7 89 2.4 min
Transport for Wales 1,060 88.7% 114 11 43 1.9 min
Thameslink 652 90.3% 48 80 77 2 min
Southern 1,691 90.5% 147 47 94 2 min
Great Western Railway 1,717 91.8% 139 9 25 1.5 min
ScotRail 2,272 91.9% 176 39 64 1.8 min
Tyne and Wear Metro 89 92% 7 0 2 1.9 min
London Overground 1,606 94.2% 89 16 57 1.3 min
Greater Anglia 1,272 95.1% 62 0 2 0.6 min
Gatwick Express 73 96.4% 1 24 21 2.8 min
Merseyrail 623 98.4% 10 1 11 on time
Chiltern Railways 336 98.6% 4 20 29 0.3 min
Heathrow Express 152 100% 0 0 0 0.1 min
South Yorkshire Supertram 37 100% 0 0 0 0.3 min

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 5,919 5,919 87.2% 4 min
Other (5 min) 14,856 14,856 88.7% 1.7 min

Cancellations

KindTrains Share
Attributed 581 93.9%
Unexplained 18 2.9%
Reported by National Rail 11 1.8%
Planned 9 1.5%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 17% (341)
Not investigated by Network Rail OU 10.7% (215)
Agreed in advance between Network Rail and the operator PL 9.9% (198)
Fatalities or injuries caused by being hit by train XC 9.4% (188)
The train due to form it arrived late YI 5.7% (115)
Trespass including non-intentional XA 5% (101)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 4.5% (92)
Signalling functional power supply failure IE 4% (81)
Not yet investigated ZW 3.9% (80)
At the train operator's request TB 3% (62)
Points failure (including no fault found) IB 2.6% (53)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 1.8% (36)
Power supply and distribution system failure IH 1.7% (34)
WTT Schedule or LTP process including incorrect simplifiers QA 1.5% (30)
Driver TG 1.4% (29)
Other technical failures below the solebar MD 1.3% (28)
Other technical failures (doors, body or interior) M8 1.3% (26)
Depot operating problem MU 1.1% (22)
Structures - bridges, tunnels, buildings, retaining walls, sea defences JD 0.8% (17)
Brake and brake system faults including wheel flats MN 0.7% (15)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.7% (15)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.7% (15)
Confirmed train cab based safety system fault including GSM-R M0 0.7% (15)
Track circuit failure (including no fault found) IC 0.5% (10)

All trains in the network

StateAll Passenger
Arrived 28,704 21,569
Planned 2,417 64
Cancelled 2,006 921
No arrival reported 539 387