The railway on 28th August 2026

TrainTimesLive
Menu Close menu

28th August 2026

33,800Trains22,914 carrying passengers
88%On timeof those that arrived
2.5 minAverage delayat their last call
957Cancelledplanned ones included
562Part cancelledran for only part of the journey
1,594Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 281 34.9% 170 12 8 18.8 min
Eurostar 28 39.3% 17 0 0 16.9 min
London North Eastern Railway 200 50.6% 80 28 10 18.7 min
Grand Central 20 65% 7 0 0 8.2 min
CrossCountry 280 66% 84 18 15 9.9 min
TransPennine Express 321 70% 65 60 44 7.6 min
Gatwick Express 72 70.5% 18 9 2 7.2 min
Chiltern Railways 347 76.2% 60 65 30 5.7 min
East Midlands Railway 493 84.3% 72 21 13 3.9 min
Great Northern 399 84.4% 57 15 18 3.2 min
Great Western Railway 1,726 85.4% 234 88 32 2.7 min
Northern 2,751 85.9% 370 81 53 2.3 min
Greater Anglia 1,290 88.4% 145 22 14 2.1 min
South Western Railway 1,613 88.9% 173 17 38 2.1 min
West Midlands Trains 1,317 88.9% 140 29 32 1.8 min
Southern 1,644 89.1% 163 96 51 2.4 min
Transport for Wales 1,031 91% 82 73 49 1.7 min
London Overground 1,453 91.6% 107 121 58 1.4 min
Elizabeth line 692 91.6% 56 6 19 1.4 min
Thameslink 610 92.2% 44 14 32 1.7 min
Southeastern 1,808 92.4% 134 32 15 1.5 min
London Underground 203 93.5% 9 63 2 1 min
c2c 366 94% 21 8 7 1.2 min
ScotRail 2,289 94.7% 121 11 4 1.1 min
Heathrow Express 152 97.9% 3 9 2 0.7 min
Merseyrail 622 98.9% 7 3 9 0.2 min early
Tyne and Wear Metro 103 100% 0 34 0 0.1 min
Island Line 51 100% 0 1 0 0.5 min early
South Yorkshire Supertram 38 100% 0 2 0 0.7 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,006 15,004 89.7% 1.4 min
Long distance (10 min) 5,925 5,924 83.6% 5.1 min

Cancellations

KindTrains Share
Attributed 882 92.2%
Unexplained 63 6.6%
Reported by Darwin 11 1.1%
Planned 1 0.1%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 17.6% (344)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 10.8% (211)
Delays not investigated by Network Rail OU 8.6% (167)
Late arrival of booked inward stock YI 6.6% (129)
Driver TG 6% (117)
Uninvestigated Cancellations System Roll-Ups only ZW 4.6% (90)
Late arrival of booked inward stock YI 3.3% (65)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 3.2% (62)
Other Passenger Train Operating Company causes TZ 2.2% (43)
Train cancelled or delayed at Train Operator's request TB 2.2% (42)
Track defects other than rail defects IS 2.2% (42)
Track defects other than rail defects IS 1.8% (35)
Train-crew rostering problem TI 1.5% (29)
Planned underpowered or shortformed service or vehicle MS 1.3% (25)
WTT Schedule or LTP process including incorrect simplifiers QA 1.1% (22)
Other technical failures above the Solebar M8 1.1% (22)
Fire external to but directly affecting the Network Rail network XL 1.1% (21)
Other technical failures below the solebar MD 1% (20)
Uninvestigated Cancellations System Roll-Ups only ZW 1% (20)
Driver TG 1% (20)
Signal failure (including no fault found) IA 1% (19)
Fatalities or injuries caused by being hit by train XC 0.9% (18)
Depot operating problem MU 0.8% (16)
Fatalities or injuries caused by being hit by train XC 0.8% (15)
Train cancelled or delayed at Train Operator's request TB 0.8% (15)
Overhead line/3rd rail defect I1 0.7% (13)
Station evacuated due to fire alarm RH 0.7% (13)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.6% (12)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.6% (11)
Other technical failures below the solebar MD 0.5% (10)
Broken/cracked/twisted/buckled/flawed rail IR 0.5% (10)
Trespass including non-intentional XA 0.5% (9)
Diesel loco failure, defect, attention MC 0.5% (9)
Delay due to incorrect ETCS system or equipment operation by Driver TS 0.4% (8)
Broken/cracked/twisted/buckled/flawed rail IR 0.4% (8)
Fires starting on Network Rail Infrastructure I9 0.4% (8)
Fire external to but directly affecting the Network Rail network XL 0.4% (8)
Trespass including non-intentional XA 0.4% (8)
Confirmed Pantograph ADD, shoe beam or associated system faults M1 0.4% (8)
Late start or yard overtime not explained by Train Operator FW 0.4% (7)

All trains in the network

StateAll Passenger
Arrived 27,632 21,505
Planned 2,624 69
Cancelled 1,950 946
Never activated 1,594 394