The railway on 31st August 2026

TrainTimesLive
Menu Close menu

31st August 2026

30,297Trains21,399 carrying passengers
93%On timeof those that arrived
1.3 minAverage delayat their last call
715Cancelledplanned ones included
337Part cancelledran for only part of the journey
990Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Grand Central 21 33.3% 14 0 0 23.1 min
Eurostar 26 34.6% 17 0 0 17.9 min
London North Eastern Railway 190 46.7% 96 8 2 15.5 min
Avanti West Coast 317 77.6% 70 1 3 7.4 min
CrossCountry 245 80% 45 10 10 5.8 min
East Midlands Railway 359 81.1% 63 14 12 5.7 min
London Underground 198 84.8% 15 102 0 1.7 min
Great Northern 323 87.8% 35 29 6 2.5 min
Transport for Wales 1,062 88.9% 96 129 70 1.8 min
TransPennine Express 345 90.6% 30 13 12 2.1 min
Southeastern 1,368 91.7% 105 49 48 1.6 min
Southern 1,493 92.2% 108 80 33 1.4 min
London Overground 1,239 92.7% 87 28 25 1.1 min
Great Western Railway 1,716 93% 115 60 11 1.1 min
Northern 2,770 93.3% 179 59 37 0.9 min
South Western Railway 1,523 94% 89 14 19 0.9 min
West Midlands Trains 1,298 94.9% 62 60 16 0.8 min
Elizabeth line 658 94.9% 32 18 12 0.8 min
Thameslink 589 95% 29 6 8 0.9 min
c2c 222 96.3% 8 2 1 1.2 min
Greater Anglia 1,258 97.7% 29 3 0 on time
ScotRail 2,273 98.3% 39 13 6 0.3 min
Chiltern Railways 298 98.3% 5 1 0 0.3 min early
Gatwick Express 74 98.6% 1 0 0 1.8 min
Heathrow Express 152 98.7% 2 0 0 0.1 min
Merseyrail 622 99.5% 3 5 5 0.4 min early
Tyne and Wear Metro 65 100% 0 2 0 0.1 min
Island Line 52 100% 0 0 0 0.6 min early
South Yorkshire Supertram 25 100% 0 0 0 0.6 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 14,392 14,390 94.3% 0.6 min
Long distance (10 min) 5,598 5,598 89.7% 3.1 min

Cancellations

KindTrains Share
Attributed 652 91.2%
Unexplained 46 6.4%
Reported by Darwin 12 1.7%
Planned 5 0.7%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 20.8% (328)
Delays not investigated by Network Rail OU 11.7% (184)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 8.6% (135)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 6.2% (98)
Other technical failures above the Solebar M8 6.1% (96)
Uninvestigated Cancellations System Roll-Ups only ZW 5.8% (92)
Late arrival of booked inward stock YI 5.1% (80)
Signalling functional power supply failure IE 2.4% (38)
Other technical failures below the solebar MD 2.2% (34)
Train cancelled or delayed at Train Operator's request TB 2.1% (33)
Late arrival of booked inward stock YI 1.8% (29)
Depot operating problem MU 1.6% (26)
Driver TG 1.5% (24)
Uninvestigated Cancellations System Roll-Ups only ZW 1.3% (20)
Track defects other than rail defects IS 1.2% (19)
Depot operating problem MU 1.1% (18)
Planned underpowered or shortformed service or vehicle MS 1.1% (17)
Time lost en-route believed to be Operator cause and information required from Operator TO 1% (16)
Points failure (including no fault found) IB 1% (15)
Other technical failures above the Solebar M8 0.8% (13)
Door and Door system faults M7 0.8% (13)
Brake and brake system faults including wheel flats MN 0.8% (13)
Driver TG 0.8% (12)
Other Passenger Train Operating Company causes TZ 0.7% (11)
Track circuit failure (including no fault found) IC 0.7% (11)
Senior Conductor or Train Manager TH 0.6% (9)
Confirmed Pantograph ADD, shoe beam or associated system faults M1 0.5% (8)
Confirmed Pantograph ADD, shoe beam or associated system faults M1 0.5% (8)
Points failure (including no fault found) IB 0.4% (7)
Broken/cracked/twisted/buckled/flawed rail IR 0.4% (6)
Cable vandalism or theft XR 0.4% (6)
Senior Conductor or Train Manager TH 0.4% (6)
Train cancelled or delayed at Train Operator's request TB 0.4% (6)
Delays not investigated by Network Rail OU 0.4% (6)
WTT Schedule or LTP process including incorrect simplifiers QA 0.3% (5)
Train-crew rostering problem TI 0.3% (5)
Other technical failures below the solebar MD 0.3% (4)
Other FOC causes including mishaps FZ 0.3% (4)
Broken/cracked/twisted/buckled/flawed rail IR 0.3% (4)
Planned cancellation identified and agreed prior to 22.00 the day before the schedule runs PG 0.3% (4)

All trains in the network

StateAll Passenger
Arrived 25,551 20,346
Planned 2,179 23
Cancelled 1,577 703
Never activated 990 327