The railway on 1st September 2026

TrainTimesLive
Menu Close menu

1st September 2026

34,048Trains22,898 carrying passengers
90.5%On timeof those that arrived
2 minAverage delayat their last call
777Cancelledplanned ones included
439Part cancelledran for only part of the journey
1,375Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 26 45.8% 13 2 0 14.3 min
Grand Central 20 65% 7 0 0 8.4 min
CrossCountry 279 70.7% 71 22 15 9.2 min
Gatwick Express 72 71.9% 18 6 2 7.5 min
London North Eastern Railway 199 72.6% 54 1 0 8.5 min
Avanti West Coast 317 80.6% 61 1 0 6.2 min
East Midlands Railway 503 81.2% 86 33 13 3.9 min
Great Northern 394 82.3% 55 65 19 3.4 min
Southeastern 1,762 83.6% 274 49 44 3.2 min
c2c 352 84.6% 53 3 4 3.4 min
Southern 1,512 87% 182 53 54 2.7 min
Thameslink 650 89.2% 64 22 37 2.6 min
TransPennine Express 320 89.5% 32 7 9 2.6 min
West Midlands Trains 1,320 89.6% 132 26 21 1.7 min
Great Western Railway 1,720 89.9% 165 69 23 2.1 min
Northern 2,751 90% 266 49 28 1.5 min
Transport for Wales 1,020 92% 76 40 35 1.6 min
Elizabeth line 693 93.4% 44 13 14 1.1 min
South Western Railway 1,614 93.8% 99 4 22 1.2 min
London Underground 191 94.5% 8 46 0 0.7 min
Greater Anglia 1,360 95% 65 48 28 1.2 min
Chiltern Railways 351 95.1% 17 4 0 0.6 min
Tyne and Wear Metro 87 95.4% 4 0 0 0.7 min
Heathrow Express 152 96% 6 2 0 1.6 min
London Overground 1,603 96.4% 51 154 36 0.9 min
ScotRail 2,272 96.5% 77 31 24 0.7 min
South Yorkshire Supertram 37 97.3% 1 0 0 0.8 min
Merseyrail 624 98.5% 9 6 8 on time
Island Line 52 100% 0 4 0 0.3 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,112 15,109 91.4% 1.3 min
Long distance (10 min) 6,090 6,088 88.3% 3.7 min

Cancellations

KindTrains Share
Attributed 682 87.8%
Unexplained 63 8.1%
Reported by Darwin 21 2.7%
Planned 11 1.4%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 20.9% (374)
Delays not investigated by Network Rail OU 11% (196)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 8.6% (154)
Driver TG 7.7% (137)
Uninvestigated Cancellations System Roll-Ups only ZW 7.2% (128)
Late arrival of booked inward stock YI 5.4% (96)
Train cancelled or delayed at Train Operator's request TB 3.1% (55)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 2.9% (52)
Late arrival of booked inward stock YI 2.6% (46)
Overhead line/3rd rail defect I1 1.9% (34)
Depot operating problem MU 1.7% (31)
Uninvestigated Cancellations System Roll-Ups only ZW 1.4% (25)
Other technical failures below the solebar MD 1.1% (20)
Other technical failures above the Solebar M8 1.1% (20)
WTT Schedule or LTP process including incorrect simplifiers QA 1% (17)
Track circuit failure (including no fault found) IC 1% (17)
Track circuit failure (including no fault found) IC 0.9% (16)
Trespass including non-intentional XA 0.8% (14)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.7% (13)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 0.7% (12)
Confirmed Pantograph ADD, shoe beam or associated system faults M1 0.7% (12)
Driver TG 0.6% (11)
Other Passenger Train Operating Company causes TZ 0.6% (11)
Points failure (including no fault found) IB 0.6% (11)
Other technical failures above the Solebar M8 0.6% (10)
Senior Conductor or Train Manager TH 0.6% (10)
Brake and brake system faults including wheel flats MN 0.6% (10)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.6% (10)
Trespass including non-intentional XA 0.5% (9)
Other technical failures below the solebar MD 0.5% (9)
Points failure (including no fault found) IB 0.5% (9)
Telecom equipment failure (including no fault found) IK 0.4% (8)
Overhead line/3rd rail defect I1 0.4% (8)
Other FOC causes including mishaps FZ 0.4% (7)
Senior Conductor or Train Manager TH 0.4% (7)
Delays not investigated by Network Rail OU 0.3% (6)
Train cancelled or delayed at Train Operator's request TB 0.3% (6)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 0.3% (6)
Planned underpowered or shortformed service or vehicle MS 0.3% (6)
Broken/cracked/twisted/buckled/flawed rail IR 0.3% (5)

All trains in the network

StateAll Passenger
Arrived 28,176 21,677
Planned 2,710 55
Cancelled 1,787 756
Never activated 1,375 410