The railway on 6th September 2026

TrainTimesLive
Menu Close menu

6th September 2026

19,059Trains13,652 carrying passengers
90.2%On timeof those that arrived
1.9 minAverage delayat their last call
437Cancelledplanned ones included
242Part cancelledran for only part of the journey
978Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 27 70.4% 8 0 0 5.9 min
East Midlands Railway 288 73.1% 70 23 5 6 min
Great Western Railway 851 74% 213 24 8 4.9 min
Avanti West Coast 204 76.7% 47 1 1 6.4 min
Elizabeth line 496 77.7% 91 49 40 3.5 min
London North Eastern Railway 160 81.6% 29 1 1 4.8 min
CrossCountry 175 84.4% 19 34 19 4.4 min
Southeastern 895 85.4% 128 10 6 3.5 min
Thameslink 491 86.7% 56 51 20 2.6 min
Southern 1,048 87.1% 126 46 29 2.7 min
Chiltern Railways 205 90.6% 19 2 0 2.1 min
Gatwick Express 72 91.7% 5 12 0 2.8 min
West Midlands Trains 655 92.5% 47 18 10 1.1 min
Great Northern 212 93% 13 17 10 1.2 min
South Western Railway 1,053 93.1% 71 11 9 1.3 min
London Overground 1,070 93.9% 61 24 44 1.3 min
Greater Anglia 879 94.1% 51 6 4 0.7 min
Transport for Wales 671 94.7% 35 5 3 1 min
Heathrow Express 151 95.3% 7 2 0 1.7 min
ScotRail 1,131 95.5% 50 8 10 0.7 min
Northern 1,230 95.6% 53 24 11 0.6 min
London Underground 156 96% 5 30 0 0.8 min
Merseyrail 364 96.7% 11 29 7 0.1 min
TransPennine Express 359 97.7% 8 4 2 0.5 min
c2c 199 98.5% 3 4 1 1 min
Tyne and Wear Metro 64 100% 0 0 0 0.4 min early
Island Line 46 100% 0 0 2 0.3 min early
South Yorkshire Supertram 25 100% 0 0 0 0.7 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 8,610 8,609 92% 1 min
Long distance (10 min) 3,984 3,983 86.3% 3.9 min

Cancellations

KindTrains Share
Attributed 390 89.2%
Unexplained 39 8.9%
Reported by Darwin 6 1.4%
Planned 2 0.5%

Why most common first

ReasonCode Share
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 16.9% (183)
Delays not investigated by Network Rail OU 12.4% (135)
Train cancelled at FOC request or planned not to run FL 8% (87)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 6.6% (72)
Uninvestigated Cancellations System Roll-Ups only ZW 5.7% (62)
Train cancelled or delayed at Train Operator's request TB 5.2% (56)
Late arrival of booked inward stock YI 4.7% (51)
Other Passenger Train Operating Company causes TZ 3.2% (35)
Train Describer/Panel/ARS/SSI/TDM/Remote Control failure IF 2.2% (24)
Broken/cracked/twisted/buckled/flawed rail IR 2.1% (23)
Driver TG 1.9% (21)
Points failure (including no fault found) IB 1.9% (21)
Track defects other than rail defects IS 1.8% (20)
Train-crew rostering problem TI 1.8% (20)
Track defects other than rail defects IS 1.5% (16)
Uninvestigated Cancellations System Roll-Ups only ZW 1.5% (16)
Late arrival of booked inward stock YI 1.4% (15)
Senior Conductor or Train Manager TH 1.1% (12)
Signalling functional power supply failure IE 0.8% (9)
Train cancelled or delayed at Train Operator's request TB 0.8% (9)
Brake and brake system faults including wheel flats MN 0.7% (8)
Signalling functional power supply failure IE 0.7% (8)
Fatalities or injuries caused by being hit by train XC 0.6% (7)
Door and Door system faults M7 0.6% (7)
Trespass including non-intentional XA 0.6% (7)
Broken/cracked/twisted/buckled/flawed rail IR 0.6% (7)
Other technical failures below the solebar MD 0.6% (7)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 0.6% (6)
WTT Schedule or LTP process including incorrect simplifiers QA 0.6% (6)
Signalling functional power supply failure IE 0.5% (5)
Axle Counter Failure J3 0.5% (5)
Driver TG 0.5% (5)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 0.5% (5)
Train crew not available including after rest FE 0.5% (5)
Cutting or embankment earthslip, rock fall or subsidence IV 0.5% (5)
Cutting or embankment earthslip, rock fall or subsidence IV 0.5% (5)
Other technical failures above the Solebar M8 0.4% (4)
Train-crew rostering problem TI 0.4% (4)
Delays not investigated by Network Rail OU 0.4% (4)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (4)

All trains in the network

StateAll Passenger
Arrived 16,413 12,849
Cancelled 1,085 431
Never activated 978 339
Planned 583 33