The railway on 7th September 2026

TrainTimesLive
Menu Close menu

7th September 2026

33,513Trains22,823 carrying passengers
90.9%On timeof those that arrived
1.8 minAverage delayat their last call
611Cancelledplanned ones included
368Part cancelledran for only part of the journey
1,278Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Avanti West Coast 316 67% 101 5 5 9.2 min
Eurostar 28 67.9% 9 0 0 6.5 min
Elizabeth line 619 68.5% 174 35 32 4 min
Heathrow Express 152 69.7% 23 76 0 8.4 min
Grand Central 20 75% 5 0 0 6.1 min
East Midlands Railway 497 76.1% 110 21 16 4.9 min
Great Northern 394 76.3% 79 35 29 4.5 min
c2c 227 83% 37 4 5 3.5 min
Great Western Railway 1,620 85.6% 224 47 14 2.8 min
London North Eastern Railway 200 86% 28 0 0 4 min
CrossCountry 280 86.3% 37 7 2 4.5 min
Southern 1,516 90.2% 138 57 45 2.3 min
Thameslink 652 90.9% 55 26 23 2.1 min
Gatwick Express 72 91.4% 6 1 1 4.4 min
Tyne and Wear Metro 87 92% 7 0 0 1.1 min
TransPennine Express 317 92.1% 24 9 6 2.3 min
West Midlands Trains 1,316 92.3% 98 30 15 1.2 min
South Western Railway 1,611 92.5% 117 14 30 1.5 min
Northern 2,745 92.8% 193 34 17 1.1 min
Southeastern 1,781 92.9% 122 23 44 1.7 min
London Underground 199 94.4% 7 74 0 0.8 min
Transport for Wales 1,038 94.6% 55 14 13 1 min
Chiltern Railways 347 95.3% 16 2 3 0.8 min
London Overground 1,608 95.9% 64 15 30 1.2 min
Greater Anglia 1,253 96.9% 39 4 5 0.5 min
ScotRail 2,269 97.1% 64 16 14 0.5 min
South Yorkshire Supertram 37 97.3% 1 0 0 0.5 min early
Merseyrail 622 97.8% 13 8 10 0.2 min
Island Line 52 100% 0 0 0 0.3 min early

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 15,205 15,198 91.9% 1.1 min
Long distance (10 min) 6,162 6,161 88.5% 3.5 min

Cancellations

KindTrains Share
Attributed 455 74.5%
Unexplained 133 21.8%
Reported by Darwin 13 2.1%
Planned 10 1.6%

Why most common first

ReasonCode Share
Train cancelled at FOC request or planned not to run FL 21.8% (355)
Uninvestigated Cancellations System Roll-Ups only ZW 14.2% (231)
Delays not investigated by Network Rail OU 12.9% (209)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 10.4% (169)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 5.5% (89)
Late arrival of booked inward stock YI 4.7% (76)
Late arrival of booked inward stock YI 2.2% (35)
Train cancelled or delayed at Train Operator's request TB 2.1% (34)
Other technical failures above the Solebar M8 1.5% (24)
Axle Counter Failure J3 1.3% (21)
Driver TG 1.3% (21)
Train-crew rostering problem TI 1.1% (18)
Other technical failures below the solebar MD 1% (17)
Uninvestigated Cancellations System Roll-Ups only ZW 0.9% (14)
WTT Schedule or LTP process including incorrect simplifiers QA 0.8% (13)
Track circuit failure (including no fault found) IC 0.8% (13)
Driver TG 0.7% (12)
Axle Counter Failure J3 0.7% (12)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.7% (12)
Other technical failures above the Solebar M8 0.6% (10)
Train cancelled or delayed at Train Operator's request TB 0.6% (9)
Other technical failures below the solebar MD 0.5% (8)
Trespass including non-intentional XA 0.5% (8)
No Cause Identified After Full Investigation by Both Parties ZU 0.5% (8)
Cutting or embankment earthslip, rock fall or subsidence IV 0.4% (7)
Delays not investigated by Network Rail OU 0.4% (7)
Points failure (including no fault found) IB 0.4% (7)
Depot operating problem MU 0.4% (6)
Not in the published list PE 0.4% (6)
Axle Counter Failure J3 0.4% (6)
Station evacuated due to fire alarm RH 0.3% (5)
Senior Conductor or Train Manager TH 0.3% (5)
Brake and brake system faults including wheel flats MN 0.3% (5)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.3% (5)
Planned underpowered or shortformed service or vehicle MS 0.3% (5)
Points failure (including no fault found) IB 0.3% (5)
Train-crew rostering problem TI 0.2% (4)
Waiting Customer's traffic including release information and documentation AJ 0.2% (4)
Other FOC causes including mishaps FZ 0.2% (4)
Broken/cracked/twisted/buckled/flawed rail IR 0.2% (4)

All trains in the network

StateAll Passenger
Arrived 28,081 21,757
Planned 2,529 78
Cancelled 1,625 599
Never activated 1,278 389