The railway on 3rd October 2026

TrainTimesLive
Menu Close menu

3rd October 2026

28,974Trains21,626 carrying passengers
92.9%On timeof those that arrived
1.5 minAverage delayat their last call
502Cancelledplanned ones included
642Part cancelledran for only part of the journey
1,149Never activatedbooked, and never appeared
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 21 50% 10 1 0 16.9 min
Avanti West Coast 287 65.6% 90 17 8 8.7 min
Grand Central 20 80% 4 0 0 6.8 min
CrossCountry 295 84.4% 45 0 6 5.6 min
East Midlands Railway 539 85.6% 72 19 20 3.4 min
Great Northern 317 88.2% 31 24 31 2.4 min
TransPennine Express 333 88.6% 36 2 15 3.2 min
Transport for Wales 1,003 89.1% 100 27 60 1.9 min
Northern 2,677 89.3% 274 43 72 1.7 min
South Western Railway 1,547 89.3% 154 51 61 2.3 min
Gatwick Express 72 90% 7 0 2 3.5 min
Tyne and Wear Metro 84 90.9% 7 6 0 1.4 min
London North Eastern Railway 171 92.4% 13 0 0 2.5 min
Thameslink 601 93% 38 12 43 1.5 min
Great Western Railway 1,560 93.2% 101 41 32 1.2 min
West Midlands Trains 1,253 93.4% 78 22 52 1.3 min
Southern 1,589 93.7% 90 78 79 1.6 min
London Underground 185 95.6% 6 48 0 0.8 min
ScotRail 2,231 95.7% 94 16 32 1 min
Southeastern 1,447 96.4% 51 7 36 0.9 min
London Overground 1,568 96.6% 48 72 68 0.7 min
Elizabeth line 665 97.2% 18 3 8 0.4 min
Merseyrail 622 97.7% 14 2 4 0.5 min
Greater Anglia 1,238 98.1% 24 4 3 0.1 min early
Chiltern Railways 226 98.2% 4 0 5 0.4 min
c2c 293 99% 3 3 4 0.1 min
Heathrow Express 152 100% 0 0 0 0.1 min early
Island Line 52 100% 0 0 0 0.3 min early
South Yorkshire Supertram 37 100% 0 0 0 0.1 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 14,322 14,321 93.7% 0.8 min
Long distance (10 min) 5,722 5,722 91% 3 min

Cancellations

KindTrains Share
Attributed 469 93.4%
Unexplained 20 4%
Reported by Darwin 10 2%
Planned 3 0.6%

Why most common first

ReasonCode Share
Delays not investigated by Network Rail OU 16.9% (238)
Train cancelled at FOC request or planned not to run FL 12.6% (177)
Late arrival of booked inward stock YI 8% (113)
Exclusion commercially agreed and documented between Network Rail and Train Operator PL 7.9% (111)
Fatalities or injuries caused by being hit by train XC 7.4% (104)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 3.6% (50)
Driver TG 3.1% (44)
Uninvestigated Cancellations System Roll-Ups only ZW 2.6% (36)
Other Passenger Train Operating Company causes TZ 2.3% (33)
Late arrival of booked inward stock YI 2.1% (29)
Train cancelled or delayed at Train Operator's request TB 1.8% (26)
Points failure (including no fault found) IB 1.7% (24)
Other technical failures below the solebar MD 1.6% (22)
Driver TG 1.4% (20)
Other technical failures below the solebar MD 1.3% (18)
Other technical failures above the Solebar M8 1.2% (17)
Fatalities or injuries caused by being hit by train XC 1.2% (17)
Train cancelled or delayed at Train Operator's request TB 1.2% (17)
Other technical failures above the Solebar M8 1.1% (16)
Signal failure (including no fault found) IA 1.1% (15)
Trespass including non-intentional XA 1% (14)
Senior Conductor or Train Manager TH 1% (14)
Senior Conductor or Train Manager TH 0.9% (12)
Uninvestigated Cancellations System Roll-Ups only ZW 0.9% (12)
Trespass including non-intentional XA 0.8% (11)
Brake and brake system faults including wheel flats MN 0.8% (11)
WTT Schedule or LTP process including incorrect simplifiers QA 0.8% (11)
Door and Door system faults M7 0.7% (10)
Track defects other than rail defects IS 0.6% (8)
Train-crew rostering problem TI 0.6% (8)
Broken/cracked/twisted/buckled/flawed rail IR 0.5% (7)
Planned underpowered or shortformed service or vehicle MS 0.5% (7)
Fatalities or injuries sustained whilst on a platform VC 0.5% (7)
No Cause Identified After Full Investigation by Both Parties ZU 0.4% (6)
Door and Door system faults M7 0.4% (6)
Broken/cracked/twisted/buckled/flawed rail IR 0.4% (6)
Fatalities or injuries sustained whilst on a platform VC 0.4% (6)
Depot operating problem MU 0.4% (5)
Disorder, drunks or trespass VA 0.4% (5)
Confirmed train cab based safety system fault including GSM-R M0 0.4% (5)

All trains in the network

StateAll Passenger
Arrived 25,367 20,475
Cancelled 1,408 718
Never activated 1,149 385
Planned 1,050 48