The railway on 9th November 2026

TrainTimesLive
Menu Close menu

9th November 2026 still running

33,301Trains22,720 carrying passengers
89.8%On timeof those that arrived
2.3 minAverage delayat their last call
349Cancelledplanned ones included
905Part cancelledran for only part of the journey
495No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 26 38.5% 16 0 0 15.4 min
London North Eastern Railway 188 44.7% 83 26 12 27.3 min
Avanti West Coast 310 73.9% 75 9 14 8.1 min
CrossCountry 271 76.2% 58 12 15 6.8 min
TransPennine Express 299 77% 63 0 25 6.2 min
Great Northern 388 80.6% 72 3 14 3.2 min
Elizabeth line 669 81.2% 70 22 274 3 min
Northern 2,644 82% 439 73 129 3.1 min
East Midlands Railway 478 84.5% 73 1 5 3.4 min
Transport for Wales 1,020 87.5% 118 19 59 2.1 min
Southeastern 1,735 88.5% 190 18 62 2.5 min
Great Western Railway 1,658 89.7% 168 12 9 2.1 min
South Western Railway 1,560 90.2% 144 16 78 2 min
Southern 1,640 91.8% 129 21 40 2.2 min
c2c 256 92.3% 19 0 9 2 min
Thameslink 610 92.9% 40 11 35 1.7 min
London Underground 173 94.2% 8 35 0 1.4 min
South Yorkshire Supertram 36 94.4% 2 0 0 0.6 min
West Midlands Trains 1,267 95% 63 4 15 0.9 min
ScotRail 2,202 95.2% 104 6 44 1.1 min
Gatwick Express 70 95.5% 3 2 2 3 min
Heathrow Express 150 95.9% 6 2 0 1.3 min
Chiltern Railways 334 96.1% 13 0 0 0.4 min
London Overground 1,490 96.8% 45 45 52 1.1 min
Greater Anglia 1,259 97% 38 3 1 0.4 min
Merseyrail 607 98.7% 8 5 7 on time
Tyne and Wear Metro 88 98.8% 1 2 0 1.2 min

Punctuality

TrainsRan ArrivedOn time Average delay
Long distance (10 min) 5,962 5,962 88.5% 4.3 min
Other (5 min) 14,271 14,261 90.3% 1.5 min

Cancellations

KindTrains Share
Attributed 305 87.4%
Reported by National Rail 20 5.7%
Unexplained 18 5.2%
Planned 6 1.7%

Why most common first

ReasonCode Share
Cancelled at the freight operator's request, or planned not to run FL 20% (247)
Agreed in advance between Network Rail and the operator PL 9% (112)
The train due to form it arrived late YI 8.2% (101)
Not investigated by Network Rail OU 8% (99)
Not yet investigated ZW 7.4% (92)
Fatalities or injuries caused by being hit by train XC 5.2% (65)
At the train operator's request TB 4% (50)
AC/DC trip (including no fault or cause found) I2 3.1% (38)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 2.9% (36)
Driver TG 2.5% (31)
Overhead line/3rd rail defect I1 2.3% (28)
Other technical failures (doors, body or interior) M8 2.2% (27)
Points failure (including no fault found) IB 2.2% (27)
Other technical failures below the solebar MD 1.9% (24)
Track circuit failure (including no fault found) IC 1.6% (20)
WTT Schedule or LTP process including incorrect simplifiers QA 1.5% (18)
Senior Conductor or Train Manager TH 1.1% (14)
Possession over-run from planned work I5 1% (12)
Depot operating problem MU 0.9% (11)
Bridge Strike XP 0.9% (11)
Disorder, drunks or trespass VA 0.8% (10)
Animal Strike or Incursion within the control of Network Rail I8 0.7% (9)
Trespass including non-intentional XA 0.6% (8)
Planned underpowered or shortformed service or vehicle MS 0.5% (6)
Cancellation of a duplicate or erroneous schedule or an identified duplicate, false or erroneous delay PJ 0.4% (5)
Brake and brake system faults including wheel flats MN 0.4% (5)

All trains in the network

StateAll Passenger
Arrived 27,188 20,920
Planned 2,375 64
En route 1,561 807
Cancelled 1,238 556
No arrival reported 495 290
Activated 444 83