13th November 2026

34,002Trains22,975 carrying passengers
84%On timeof those that arrived
3.2 minAverage delayat their last call
1,337Cancelledplanned ones included
1,224Part cancelledran for only part of the journey
809No arrival reportedstarted, then went quiet
0Stopped shortdid not reach the last stop

By operator least punctual first

OperatorTrackedOn time LateCancelledPart cancelledAverage delay
Eurostar 29 48.3% 15 0 0 10.2 min
CrossCountry 282 53.1% 105 13 46 13.2 min
Avanti West Coast 318 62.5% 115 7 4 10 min
London North Eastern Railway 200 73.7% 52 0 2 6.5 min
TransPennine Express 314 75.6% 71 3 20 5.8 min
Great Western Railway 1,730 75.8% 368 125 82 4.9 min
Gatwick Express 72 76.1% 16 0 5 6.5 min
Elizabeth line 691 77% 131 40 82 4.7 min
Transport for Wales 1,051 78% 184 81 139 4.4 min
South Western Railway 1,617 78.9% 298 33 169 4.3 min
Northern 2,734 80.9% 506 33 51 3.1 min
East Midlands Railway 508 82.7% 85 8 9 3.8 min
Great Northern 403 83.2% 63 16 11 3 min
Chiltern Railways 351 84% 50 10 28 3.1 min
Southern 1,694 85.4% 227 49 89 3.2 min
ScotRail 2,284 88.2% 260 30 34 2.4 min
Thameslink 651 88.9% 69 0 32 2.8 min
West Midlands Trains 1,308 89% 136 24 43 2 min
Southeastern 1,810 89.1% 188 30 57 2.1 min
London Overground 1,601 89.3% 79 659 214 1.9 min
South Yorkshire Supertram 45 91.4% 3 11 5 1.3 min
c2c 367 91.8% 28 1 23 1.8 min
Tyne and Wear Metro 90 93.3% 6 1 0 1.7 min
London Underground 224 93.4% 9 86 2 1.1 min
Merseyrail 622 93.8% 38 0 11 1 min
Greater Anglia 1,275 94.3% 65 75 65 1 min
Heathrow Express 152 98.7% 2 0 0 1 min

Punctuality

TrainsRan ArrivedOn time Average delay
Other (5 min) 13,857 13,848 84.5% 2.4 min
Long distance (10 min) 6,066 6,066 82.9% 5.2 min

Cancellations

KindTrains Share
Attributed 1,187 88.8%
Unexplained 90 6.7%
Reported by National Rail 32 2.4%
Planned 28 2.1%

Why most common first

ReasonCode Share
Points failure (including no fault found) IB 23.3% (641)
Cancelled at the freight operator's request, or planned not to run FL 12.6% (346)
The train due to form it arrived late YI 9.1% (250)
Not yet investigated ZW 8.9% (244)
Not investigated by Network Rail OU 8.5% (234)
Agreed in advance between Network Rail and the operator PL 6.1% (168)
Delays incurred on non-Network Rail running lines or networks including London Underground TX 4.3% (120)
At the train operator's request TB 4.1% (111)
Power supply and distribution system failure IH 2.3% (65)
Signal failure (including no fault found) IA 2.2% (63)
Broken/cracked/twisted/buckled/flawed rail IR 2.1% (56)
Driver TG 1.2% (33)
Other technical failures below the solebar MD 1% (28)
Not in the published list PE 1% (27)
Axle Counter Failure J3 0.9% (26)
Planned underpowered or shortformed service or vehicle MS 0.8% (23)
Depot operating problem MU 0.7% (18)
Track circuit failure (including no fault found) IC 0.5% (15)
Confirmed train cab based safety system fault including GSM-R M0 0.4% (12)
Senior Conductor or Train Manager TH 0.4% (11)
Confirmed Pantograph ADD, shoe beam or associated system faults M1 0.4% (11)
WTT Schedule or LTP process including incorrect simplifiers QA 0.4% (11)
Track defects other than rail defects IS 0.4% (10)
Trespass including non-intentional XA 0.3% (9)
Special working for leaf-fall track circuit operation QJ 0.3% (9)
Time lost en-route believed to be Operator cause and information required from Operator TO 0.3% (9)
Possession over-run from planned work I5 0.3% (9)

All trains in the network

StateAll Passenger
Arrived 27,915 20,766
Cancelled 2,753 1,712
Planned 2,525 69
No arrival reported 809 428